Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and FillThe Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure
Jan 1, 2002
-
Structuring Meaningful MentoringBy J Coombes
Within the mining industry there is a growing trend of placing inexperienced technical people into positions of responsibility beyond their readiness. Their responsibilities often include providing th
Nov 20, 2012
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
Bituminous Geomembranes in Mine ConstructionBy R McIlwraith, B Breul
"This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i
Jul 27, 2015
-
Mining Under Indonesia's New Environmental LawThe new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid
Jun 1, 2010
-
Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft ClayBy R Ayothiraman
Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e
Mar 8, 2011
-
Example of a Dynamic Flotation FrameworkFroth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive
Jan 1, 2005
-
South-west Ventilation Shaft Project at Newstan MineBy D Piason
Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of
Aug 31, 2015
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
New Bendigo Gold ProjectThe Bendigo goldfield is centred on the urban area of Bendigo (population approximately 60 000) in central Victoria, 130 km north west of Melbourne, Australia. Gold was discovered at Bendigo in 1851 a
Jan 1, 2002
-
Progress in Aluminum TherapyThe prevention of silicosis by metallic aluminium has been reported by Denny, Robson, and Irwin in two papers. The first was published in 1937; the second, in 1939. The results definitely established
Jan 1, 1944
-
Why I don’t believe in reconciliationBy S Dunham
For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m
May 24, 2023
-
Team Alignment Towards Alternative Project Delivery MethodsProject delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en
Jan 1, 2009
-
The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel ProjectBy C Czerny, T Elkington, L Lorenzen
The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha
Sep 29, 2013
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, MalaysiaBy B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
Structural Elements in Epithermal Gold Deposits of the Coromandel Peninsula, New ZealandBy D S. Clarke, K B. Sporli
Structure is an important control in the localisation of gold mineralisation in epithermal systems. There has been, however, only limited investigation of the structural elements involved; such a stud
Jan 1, 1990
-
Feasibility Study on Cemented Backfill in Longwall Coal Mine for Surface Subsidence ControlBy Caigen Wang, Wending Ma, Xiexin Mi
The urgent need for the control of surface subsidence caused by longwall coal mining in densely populated areas of China has led to a feasibility study on the effectiveness of longwall goaf cemented b
Jan 1, 1998
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Mining Environmental Impacts Evaluation in a Karstic Zone using Geographical Information SystemsAnalysis of different environmental scenarios and to represent, spatially, of impacted areas is possible by the use of geoprocessing techniques, specifically Systems of Geographical Information (SIG).
Dec 6, 2010
-
Dust Monitoring at Northparkes MineQualitative measurement of respirable dust in metal mines is limited and an example of this is demonstrated at Northparkes Mine, where operational experience was sought for measuring dust standards an
Jan 1, 2008