Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorBy Morrison R. D
This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co
Jan 1, 1983
-
Application of Knowledge Based Expert Systems in the Mining IndustryExpert systems are a product of Artificial Intelligence (AI), a field of long standing, dedicated to the study of problem solving using heuristics, construction of symbolic representations of knowl
Jan 1, 1998
-
A Review of Coal Mining Safety Research in QueenslandThe incidence of colliery disasters has highlighted the need for more centralised and directed coal mining safety research in Queensland, with particular impetus from explosions at Box Flat in 1972, K
Jan 1, 1991
-
Revegetation Of Mine Wastes And Disturbed Areas In An Arid EnvironmentBy Trudinger J. P
Concern for the environment by the public and by mining companies, has led to many recent attempts to revegetate areas disturbed by mining activities. The problem of successfully revegetating dist
Jan 1, 1976
-
Monitoring Indices for the Support and Surrounding Strata System on a Longwall FaceBy He F, Zhu D
How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of t
Jan 1, 1992
-
Fluxing Requirements for Copper Smelting SlagSilica and limestone fluxing levels in copper smelting slags were studied. Copper concentrates with flux additions were smelted to matte (55.5 per cent Cu) and slag in a pilot scale submerged combusti
Jan 1, 1985
-
The Super Pit - Resource OptimisationBy Neill A. O, Worth I, O&apos
The formation of Kalgoorlie Consolidated Gold \lincs 1't% Ltd hati pla,xd all the major the gold producing areas adjacent to the city of Kalgoorlie/Boulder under one management, enabling the deve
Jan 1, 1993
-
The Practice of Engineering Geology in the Planning and Construction of the City of Canberra, A.C.T., AustraliaBy de Vries D, Wilson EG, Henderson GAM, Carter EK
Canberra is a planned city in which the natural environment, rather than existing development and land tenure, has until recent times at least, imposed the major constraints to development. Even r
Jan 1, 1986
-
An Exploratory Study Of Pre-Nucleated PelletisationBy Adamiak Z. P, Nicol S. K
An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared
Jan 1, 1974
-
Measurement and Prediction of PbO Activities in Industrial Lead Smelting SlagsPbo activities have been measured in conventional blast furnace and direct smelting type slags at 1200¦C. Much higher activity coefficients than previously measured have been obtained and attribut
Jan 1, 1984
-
Advanced Design Concept on Largest Diesel-Mechanical Truck-Komatsu HD1600MBy Kato Y
As a direct result of the Mining Industries need to improve efficiency and production in Open Pit type operations, the size of haulage units have increased dramatically. This trend has continued su
Jan 1, 1982
-
Servicing the Mining Industry - The Mt. Newman ExperienceTo the layman or the casual in- vestor, the critical problems in the mining industry appear to rest on the questions of finding and developing an orebody. The high cost of finding a major orebody
Jan 1, 1975
-
Recent Developments in Blast Furnace PracticeDevelopments in furnace construction and design have been very rapid in recent years. Larger furnaces operating at high top pressures with much improved burdens are giving extremely high productio
Jan 1, 1972
-
Grade Control Techniques at Paddington Gold MineBy Amos QG
The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan
Jan 1, 1986
-
Residue Treatment Plant Practice at Risdon, TasmaniaBy Garrigan J. S, Oakes I
Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl
Jan 1, 1977
-
Modified Open Cut Equipment in Underground Mining at King Island ScheeliteBy McLaughlin R. G, Brammer R. A J
King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die
Jan 1, 1977
-
The Evolution of Blasting Practice at the Kidston Gold MineBy Paine GG
The Kidston Gold Mine commenced mining in 1984 and current annual production is 12 million tonnes, increasing in 1990 to 18 million tonnes. Mill throughout per year is 4 million tonnes with the bala
Jan 1, 1988
-
Risk Assessment for New Technology in the Open Cut - Wambo DraglineBy Lumley G. I, Duffy W. J
The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be
Jan 1, 1992
-
Operation of the Process Plant at TolukumaThis paper reviews the commissioning and operation of the process plant at Tolukuma over the past 18 months. The plant treats a high-grade gold and silver ore through a SAG mill followed by a conven
Jan 1, 1997
-
Oxidation Reduction Potential of Activated Carbon During Anion LoadingBy Muir DM, Tsuchida N, Dalton R
The adsorption or loading of anions onto extruded based peat activated charcoal has been studied by potential measurements in a flow through cell. Loading rates are in the order F-
Jan 1, 1984