Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    Comparative dissolution behaviours of recycled cement paste and lime in EAF slag under static conditions

    By Z Li, Z Yan, M Yang

    Recycled cement paste (RCP) is a kind of CaO-rich recourse, which is separated and recycled from waste concrete. Due to its chemical composition, RCP could partially replace lime as a flux and be load

    Aug 21, 2024

  • AUSIMM
    Oxygen Pressure Leaching of a Bulk Flotation Concentrate form a Complex Cu-Pb-Zn Sulphide Ore

    By Canterford J. H, Sparrow G. J, Dyson N. F

    Pressure leaching of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore was carried out at 150 and 190¦C under 1050 kPa oxygen overpressure in 1 L and 4 L titanium autoclave

    Jan 1, 1989

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    Effect of pebbles on collisional environment in a ball mill using composite media (balls/pebbles)

    By S Nkwanyana, I Govender

    Batch experiments in a 0.6 m diameter mill have shown that improvements of about 13 per cent in the efficiency of energy utilisation can be realised in ball mills by replacing 25 per cent of the ball

    Aug 24, 2022

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    Geotechnical Challenges in Narrow Vein Mining

    By J Hadjigeorgiou

    Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o

    Mar 26, 2012

  • AUSIMM
    Megablasts – Enabling Technologies in BHP Billiton Iron Ore

    By B Green

    With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed

    Aug 24, 2015

  • AUSIMM
    Geomembranes – from design to handover and some of the lessons learnt

    By A Marta

    Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li

    Jul 23, 2018

  • AUSIMM
    JKSimFloat - A Tool for Flotation Modelling

    By R D. Morri, D J. Alexander

    The design and optimisation of mineral flotation circuits is currently performed using a combination of laboratory, pilot plant and full scale testing. Owing to the variable nature of flotation circui

    Jan 1, 1998

  • AUSIMM
    Competitiveness of Australian Coal in Relation to Transport Distance

    By Gillies A. D S

    Rail, port and shipping charges represent 30 to 50 per cent of landed costs for Australian coal mines selling to Asia. This proportion is higher for sales to Europe, yet it is in Europe where Austra

    Jan 1, 1994

  • AUSIMM
    Studies on Extraction of Refractory Gold and Silver Through Thiourea Leaching

    By Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R

    The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam

    Jan 1, 1992

  • AUSIMM
    In Situ Stress Measurements Using Oriented Core

    By G Baird, M Seto

    A low-cost methodology that allows the determination of in situ stresses using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stage

    Jan 1, 2000

  • AUSIMM
    Getting Back in Front – Time for a Step Change in Engagement Practices

    By K Eglinton

    The extractive industries response to community engagement due to social and political pressures in the 1980s and 1990s was the starting point of development leading to the modern function of corporat

    Nov 22, 2011

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • AUSIMM
    Phosphorus association with goethite – effects of Fe(II)-catalysed recrystallisation

    By M I. Pownceby, N Karimian, A Frierdich

    These may be found with goethite through mechanisms including direct substitution or coprecipitation of nanocrystalline phases. Understanding P incorporation in goethite has significant implications f

    Sep 18, 2023

  • AUSIMM
    A coupled gas flow-geomechanical model based on energy analysis in coal and gas outburst simulation

    By F Soleimani

    Coal and gas outburst is a common hazard in coalmines and due to the complexity of its nature, efficaciously predicting the possibility of its occurrence is intricate. The mechanical and gas flow prop

    Oct 12, 2022

  • AUSIMM
    Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, Tasmania

    The purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes

    Jan 1, 1949

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014