Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall

    By Paul J. Sabatini, Yazen A. Khasawneh

    "A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse

    Jan 1, 2017

  • DFI
    The Use Of Micropiles In Estonia

    By T. Ruben

    Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.

    Jan 1, 2000

  • DFI
    Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983

    By Clyde N. Baker

    Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted

    Jan 1, 1984

  • DFI
    120 Years of Caisson Foundations in Chicago

    By Robert E. Schock, Eric J. Risberg

    "Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which

    Jan 1, 2016

  • DFI
    Excavation Bracing Technology ? Synopsis

    By G. F. Sowers

    Excavation bracing is a special structural system. It is built from the top down. The design is controlled by the economical construction of another structure as well as by the movement of the ground

    Jan 1, 2010

  • DFI
    Discussion On Base Grouted Piles

    By V. M. Troughton

    Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim

    Jan 1, 1991

  • DFI
  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary

    By Lucien P. Weber

    Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an

    Jan 1, 1997

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Underpinning With Steel Pipe Piles

    By Pasi Korkeakoski

    There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and

    Jan 1, 2000

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place Piles

    By Garland E. Likins

    High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec

    Jan 1, 1995

  • DFI
    Presentation #4 - Reflections On Pile Integrity Testing

    By Joram M. Amir

    Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]

    Jan 1, 2001

  • DFI
    Recent Developments In The Law Of Deep Foundations

    By Brian P. Waagner

    Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c

    Jan 1, 2002

  • DFI
    South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington

    By James Su

    The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta

    Jan 1, 1998