Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    List Of Delegates

    AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,

    Jan 1, 1994

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd

    Jan 1, 1990

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • DFI
    Emplacement Techniques: Impervious And Pervious Wall Construction ? Summary

    By Fred C. Schmednecht

    For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w

    Jan 1, 1999

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • DFI
    Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - Synopsis

    By S. Narasimha Rao

    Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc

    Jan 1, 1996

  • DFI
    High Risk Control For Piling And Deep Foundations - A Systematic Approach

    By Martin van Staveren

    In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu

    Jan 1, 2006

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable Waterways

    By Michael A. Knott

    Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit

    Jan 1, 2013

  • DFI
    Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis

    By Z. Q. Zhou

    It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and

    Jan 1, 2010

  • DFI
    Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour

    By Guo H. Lei

    Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro

    Jan 1, 2006

  • DFI
    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise

    Jan 1, 2014

  • DFI
    Eglinton Crosstown, a New Step in Toronto’s Subway System

    By Lars Richter, Franz-Werner Gerressen

    "The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation

    Jan 1, 2017

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004