Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Wood Refuse Burning in the Central Steam Plant Hollinger Mine

    By E. T. Turner

    Introduction 1n assembling material for this paper on Wood Refuse Burning 1 turned first to the records of our early studies of the problem in order to learn how and why certain basic decisions were

    Jan 1, 1951

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995

  • CIM
    High-pressure direct injection of natural gas in a diesel engine for high performance/low emissions (ace69f9b-8abb-4cd4-9306-9db2c42ce4ca)

    By K. B. Hodgins, P. Ouellette

    "The North American mining industry faces challenging emissions regulations in the coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, indu

    Jan 1, 2005

  • CIM
    A 21st century advancement for mine hoisting systems: Frictionless non-powered emergency arrestors

    By E. Pribonic

    Failure of a mine material hoist can cause injuries, fatalities and significant infrastructure damage, along with an associated loss of production. Principal causes of hoist accidents are overwind and

    Jan 1, 2008

  • CIM
    The Intec Zinc Process

    By J. Moyes

    The Intec Process is a generic process for the production of pure base metals and precious metals from sulphides concentrates derived from copper, nickel, zinc and lead ores. The development program f

    May 1, 2002

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • CIM
    Using Effective Stress Theory to Characterize the Behavior of Backfill

    The importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on

    May 1, 2007

  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005

  • CIM
    On the History of Geophysical Exploration

    By Hans Lundberg

    Introduction Today, geophysical exploration is recognized as a special science wedged between geology and mining. Universities and technical institutes have special professors teaching geophysics a

    Jan 1, 1948

  • CIM
    Doing More with What We Already Know – Improving the Efficiency of Minerals Processing

    By Joe Pease

    "The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin

    Jan 1, 2015

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    Identification of Active Sites and Influence of Real Structure of Gold Catalysts in the Selective Hydrogenation of Acrolein to Allyl alcohol

    By Peter Claus

    In the last years, supported gold catalysts with particle sizes smaller than 10 nm have attracted a lot of attention. While gold bulk metal is rather inert in chemical reactions and, thus, is of low i

    Oct 1, 2003

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)

    By T. G. Joseph

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    Nov 1, 2011

  • CIM
    Use of Coal for Treatment of a Pulping Waste

    By F. Daniel Rosenkranz, Peter L. Silveston

    Experiments investigating the treatment of a ground wood white water waste from an Ontario pulp and paper mill by an HVCB coal are reported. Adsorption capacity for the waste, with a soluble COD contr

    Jan 1, 1970

  • CIM
    The Wellington Lake Power Project

    By E. M. Stiles

    THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that

    Jan 1, 1940

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Geochemistry of the Platinum-Group Elements

    "4.1. IntroductionThis chapter reviews the geochemistry of the platinum-group elements (POE) in sulphur-poor silicate rocks, and the limited data on POE in silicate, oxide, sulphide, arsenide and sulp

    Jan 1, 1979

  • CIM
    Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

    By Brad Thrall, Howard Bradley, Michael Samuels

    "LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondi

    Jan 1, 1999