Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mining Title Administration in the Northern Territory

    Exploration and mining title administration in the Northern Territory has changed dramatically over the last 20 years. These changes have occurred due to legislative amendments, technological develo

    Jan 1, 1994

  • AUSIMM
    Development of a nitrogen prediction model for 320 tonne converter

    By Y D. Jeon, K S. Kim, C-H Eom, C M. Yoon

    The carbon neutrality continues to require reduction of carbon usage in ironmaking and steelmaking processes. Specially, it is expected that the hot metal ratio (HMR) in the steelmaking process should

    Aug 21, 2024

  • AUSIMM
    Characterising coalmine roof using measurement-while-drilling technology

    By M Khanal, J Qin, B Shen, Y Duan, X Luo

    Gaining confidence in interpreting rock and strata properties of the coalmine roof is necessary for design, maintenance, modelling and optimisation of roadways supports. One of the key causes of roadw

    Nov 29, 2022

  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Complex Criterion for Real-Time Truck Dispatching

    By Shuguang L, Jing S

    Computer controlled truck dispatching systems is a newly-developed technical system in surface mines with shovel-truck technology. The real time dispatching criteria, as the core of optimal truck di

    Jan 1, 1995

  • AUSIMM
    Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim (89cff146-d60b-4074-bb84-62f6785f9161)

    By Totterdell JM

    The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early

    Jan 1, 1995

  • AUSIMM
    Utilization of Victorian Brown Coal-Future Prospects

    By Royston D

    Victoria has an extensive brown coal resource, 202,000 Mt, of which 43,300 Mt is regarded as readily recoverable. This brown coal is located principally in the Latrobe Valley as thick seams and is

    Jan 1, 1987

  • AUSIMM
    Inferring the earth moving equipment–environment interaction in open pit mining

    By M Balamurali

    In mining, grade control generally focuses on blasthole sampling and the estimation of ore control block models with little or no attention given to how the materials are being excavated from the grou

    Jun 22, 2022

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Operation and Optimisation of the Argyle HMS Plant

    By Hutton W

    The Argyle Diamond Mine is the first significant diamond producer in Australia. The project has been developed with new concepts in circuit design, process control technology, organisational deve

    Jan 1, 1987

  • AUSIMM
    The "New Generation" of International Projects

    Any engineering firm hoping to do business in the modern world must understand-and take into account-the social and economic realities of client, country, culture, and community. If these consider

    Jan 1, 1978

  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • AUSIMM
    Tribute to Dr Donald Martin Hausen

    This paper is a tribute to the late Dr Donald Martin Hausen as a father of applied mineralogy. His dedication to promoting the field through technical societies and through his professional work was o

    Jan 1, 2008

  • AUSIMM
    PT Allied Indo Coal

    By Enugroho E, Nashution Y, Susanto M

    PT Allied Indo Coal is the owner of the Parambahan Open Cut Coal Mine in the Ombilin Basin in West Sumatera with an annual production of in excess of 0.5 million tonnes/year of saleable coal.The paren

    Jan 1, 1992

  • AUSIMM
    The Isa Sizer - High technology Vibrating Screen

    Mount Isa Mines Limited commissioned the Heavy Medium Plant in August 1982. The first processing stage using Mogensen Sizer 2056 dry screens, experienced unresolvable cloth blinding problems in atte

    Jan 1, 1988

  • AUSIMM
    Recovery of Gold from Lancefield Arsenical Sulphide Ore

    By Kellett KR

    Gold Mining at the Lancefield Mine was commenced initially in 1897 and continued intermittently through to 1956 when rising costs and mine cave-in forced closure. The mine was redeveloped in 1981 and

    Jan 1, 1984

  • AUSIMM
    A Methodology for Measuring the Floatability of Ores û The Floatability Index Test

    By D A. Collins

    The floatability methodology developed by the AMIRA P9 project through research contributions by the Julius Kruttschnitt Minerals Research Centre (JKMRC, Brisbane, Australia), University of Cape Town

    Jan 1, 2008

  • AUSIMM
    Optimisation & Control Development For An Expanded Grinding Circuit In NHBC Concentrator

    By Marsham B, Baker D. C

    The expansion of New Broken Hill Consolidated Limited (NBHC) concentrator necessitated the installation of hydrocyclone classifiers where rake classifiers had previously been used. Commissioning o

    Jan 1, 1983

  • AUSIMM
    The Benefits of Computational Modelling in Improving Iron Ore Production and Processing

    By M P. Schwarz

    A major issue presently faced by companies producing and processing iron ore is the need to maximise throughput while minimising capital expenditure. While present high demand means this is of prime i

    Jul 11, 2011

  • AUSIMM
    Experimental and thermodynamic study of the phase equilibria in the NiO-CaO-FeO-Fe2O3 system in air and in equilibrium with metal (Fe-Ni) alloy

    By S Sineva, E Jak, M Shevchenko, D Shishin

    This study represents a part of comprehensive research aimed at integrating nickel into a thermodynamic database constantly developed at Pyrosearch. The behaviour of Ni in calcium-ferrite slags is con

    Aug 21, 2024