Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Production Drill Optimisation at Telfer Underground - A Move Towards Automation

    By P F. Knights, P Boniwell

    This paper investigates the causes of low effective utilisation of the production drill fleet at the Telfer Underground Gold Mine, as measured by the percussion hours per shift. The first part of this

    Jan 1, 2008

  • AUSIMM
    A Spatially Enabling Relational Geologic Database of Java Island,Western Sunda Arc of Indonesia ù A Step to the Geoscience and Mining Data Model

    By K Watanabe

    A relational database in which its complex contents can be navigated through a map interface (ie spatially enabling) is relatively a new concept yet attractive for geoscience fields. This concept is m

    Jan 1, 2004

  • AUSIMM
    The Making And Evaluation Of Directly Reduced Iron Pellets (f90b3e65-709c-44cc-8d01-7748562da6e5)

    By Wright J. K

    In recent years the production of steel from directly reduced iron ore pellets has ex- panded rapidly. However continued growth will depend on an adequate supply of suitable raw materials for the va

    Jan 1, 1980

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel Caving

    By G J. Zhang

    The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved

    Jul 11, 2011

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022

  • AUSIMM
    Contributed Discussion to "A New Mineral in the Geocronite-Jordanite Family and Its Implications in Differential Flotation" by Ranen Sen and David J. Spottiswood (Bulletin and Proceedings Vol. 289, November/December, 1984)

    The title of this paper implies, and the text explicity states, that Sen and Spottiswood (1984) have found a new mineral species related to geocronite and jorganite. I believe that there is inadequate

    Jan 1, 1985

  • AUSIMM
    Background Characterisation Study of Naturally Occurring Acid Rock Drainage in the Sangre De Christo Mountains, Taos County, New Mexico

    By B Walker, A Robertson, C Wels, S Fortin

    A background characterisation study was carried out in the Sangre de Cristo mountains, New Mexico, to: quantify naturally occurring contaminant loads from mineralised areas; define site-specific back

    Jan 1, 2003

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Modelling of Near-Source Dust Dispersal From Surface Mine Blasting in Weak Wind and Tropical Conditions

    By S Bhandari

    This paper is a step in the direction of developing a computer model of the near source dispersal of suspended particulate matter (SPM) in planetary boundary layer (PBL). Since Surface Mine blasting i

    Jan 1, 2001

  • AUSIMM
    A practical guide to sampling in coal preparation plants

    By B W. Atkinson, J Docherty

    An Australian Working Group has been compiling a guide for operators to use in order to improve the efficacy of their routine and non-routine sampling tasks within their coal preparation process. The

    May 9, 2017

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008