    Comparison between ball mill and vertical stirred mill for the fine grinding of a low-grade iron ore

    By H Turrer, M Badawi, R Belissont, Y Foucaud, E Kleiderer, L Southavy, J Mesquita, Y Basselin

    The Mont Reed iron ore deposit, owned by ArcelorMittal, is situated approximately 140 km southwest of the Mont-Wright mine in the southern region of the Labrador Trough, Canada. Acquired by Québec Car

    Sep 18, 2023

  • AUSIMM
    Oxygen Pressure Leaching of a Bulk Flotation Concentrate form a Complex Cu-Pb-Zn Sulphide Ore

    By Canterford J. H, Sparrow G. J, Dyson N. F

    Pressure leaching of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore was carried out at 150 and 190¦C under 1050 kPa oxygen overpressure in 1 L and 4 L titanium autoclave

    Jan 1, 1989

  • AUSIMM
    Zero Liquid Discharge in Coal Mining Operations

    By A Dal-Corobbo, R Zick

    The coal mining industry is now faced with new regulatory requirements that limit the discharge of chlorides into receiving streams. To meet these new regulatory standards for treated mine water, a ze

    Nov 26, 2013

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western Australia

    By P Hodkiewicz

    Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E

    Aug 22, 2011

  • AUSIMM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultra-Fine Sulfide Concentrate

    By G DeschOnes, M Fulton

    The Eleonore property (James Bay district of Northern QuTbec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Sep 26, 2013

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Surface Cooling at Kidd Creek Mine

    By K Hortin

    Kidd Creek mine in north western Ontario is developing phase 1 of the deep mine project for mining between 2100 m and 3100 m below surface. Heat problems were experienced during the 2003 summer in wor

    Jan 1, 2005

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    Safety and Financial Value Created by Good Slope Management Strategies and Tactics

    By A R. Bye, T R. Stacey

    Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen

    Jan 1, 2007

  • AUSIMM
    Failure and Opportunities for Success

    Coal mining legislation makes frequent reference to æSafety Management SystemsÆ but there is a chronic shortage of useful guidance material as to how these might be applied to hazardous exposures. Sev

    Jan 1, 2005

  • AUSIMM
    The æMountain Camp Reef' at Alford's Mine, Wakamarina, Marlborough: Active Role of Fault Dynamics Controlling Lode Emplacement

    The æMountain Camp reefÆ at Alford's mine, Wakamarina,Marlborough, had no recorded gold production although assays of 5 - 26 g/t were reported, but it did produce c. l000 kg of scheelite. The lod

    Jan 1, 1996

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Carburisation and melting of hot compacted iron in a coke bed

    By M Kim, J Park, I-K Suh, E Kim, J Lee

    One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp

    Aug 21, 2024

  • AUSIMM
    Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal Operations

    By P Craig, I Canbulat, J Naylor, J Emery, A Sykes

    Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th

    Nov 5, 2014

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    World Copper Demand in 2050

    For the mineral industry, sustainability seems to mean socially positive and ecologically neutral mineral extraction. Mines are financed and developed in response to demand for their products. The pur

    Jan 1, 2002