Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction of Optimum Cleaning Results for an Undeveloped Coal SeamBy Sanders GJ
Coals from the Southern Coalfield of New South Wales treated in the Port Kembla coal preparation plants of Australian Iron and Steel Pty Ltd differ substantially in their characteristics. Knowledge o
Jan 1, 1970
-
Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New ZelandBy Gregg PEH, Horne D, Bolan N, Stewart RB
The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on si
Jan 1, 1995
-
The Role of Simulation Modelling in Project EvaluationTSG Consulting works with many of the major global mining companies using simulation modelling as an integral component in their development teamÆs processes to determine which combination of infrastr
Jan 1, 2007
-
Three Dimensional Numerical Modeling of Effects of Subsidence on EscarpmentsBy McNabb K. E
Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing emp
Jan 1, 1992
-
Greening The Valley: A Concept for Improving the Landscape of the Central Latrobe ValleyThis paper discusses the significant land use changes that have occurred in the Latrobe Valley during 150 years of white occupation. The developments and changes were haphazard and made with little th
Jan 1, 1992
-
Titanium Research at the University of MelbourneBy Worner H. K
The paper briefly summarises the work of the Titanium Research Section in the Metallurgy Department of the University of Melbourne and mentions the development of a new electrolytic process for titani
Jan 1, 1956
-
Long-Term Evaluation of Diesel Particulate Filter Systems at IncoÆs Stobie MineBy A D. Bugarski, B R. Conard, G H. Sc
The objective, of the Diesel Emissions Evaluation Program (DEEP)-sponsored project at IncoÆs Stobie mine, was to conduct a long-term field evaluation of selected diesel particulate filter (DPF) system
Jan 1, 2005
-
Slope Stability Major Hazard Management Plan and Operating Procedures at Cadia Hill Open Pit, Cadia Valley Operations, Newcrest Mining LimitedBy D J. Clark, S Hewson, T Li
Cadia Hill Pit is a gold copper porphyry deposit hosted in monzonite. The pit slope design is primarily based on structural controls related to faults and shears with largely massive rock masses betwe
Jan 1, 2003
-
Prediction and Measurement of Size Distributions from Coal Mine to Coke OvenBy Callcott R
Prediction of raw coal size distributions and those generated by processing are examined using spreadsheets and the matrix analysis of breakage processes. Run of mine coal size distributions are pre
Jan 1, 1998
-
The pilot plant demonstration of a novel hydrometallurgical route for the processing of low grade base metal sulphidic mattesBy Keys NJ
The so-called COMAT process provides a method for leaching low grade sulphide mattes in an acidic ferric sulphate medium in such a way that non ferrous base metals such as Ni,Cu and Co are substan
Jan 1, 1986
-
The Gold and Silver QuestionThe able address on the currency question given by the Right Honorable A. J. Balfour, M.P., late leader of the Government, at the Mansion House lately, before a large and influential audience, will st
-
Water Consumption Optimisation in Copper Heap Leach-SX-EW ProjectsWater is a key resource input to copper heap leach operations in both quality and quantity. A number of recent developments in analysis of the technology have shown that water consumption can be optim
Jan 1, 2003
-
Introduction of Down-Reaming in AustraliaBy G Mulder, M Adams
Since the introduction of raiseboring 30 years ago there have been many operational and mechanical design improvements in the raiseboring machine, its reamers and associated cutters. These have now ma
Jan 1, 1998
-
Axial Accretion in the North Fiji Basin (SW Pacific) Between 16¦ and 22¦ SBy Gente P, Eissen JP, Lafoy Y, Charlou JL
The North Fiji Basin (NFB) is delineated by the Vitiaz trench to the North (paleo sub duction zone, Brocher, 1985), the Vanuatu is- land arc (called before New Hebrides arc) to the West and South,
Jan 1, 1987
-
Electrochemistry and Mechanism of Leaching Gold with Ammnoniacal ThiosulphateBy Jin C, Shi X
The electrochemistry of leaching gold with thiosulphate has been studied systematically by using electrochemical techniques. Results show that the current peak of anodic dissolution of gold occurs a
Jan 1, 1993
-
Dewatering Tailing Slurries: When Can Drainage be Used?Dewatering tailing slurries by mechanical means is often not possible and gravity and solar driven processes must be used. It has been shown previously that better use of gravity is achieved when t
Jan 1, 1978
-
Signalling Equipment for Shaft Hoisting at North Broken Hill LimitedThe mmmg operations carried out by North Broken Hill Limited, necessitate the use of four shafts for the haulage of ore, men, and supplies. These are:-1. Blackwood's Shaft.-British Section, which
Jan 1, 1940
-
Hydrogeological Testing in Underground Holes during GroutingThe development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction
Jan 1, 1988
-
Numerical Simulations of Bulk Handling in Screw Conveyors by Three-Dimensional DEMBy P Cundall
Three-dimensional DEM (Distinct Element Method) simulations were conducted in order to examine the performance of screw conveyors, which are installed to transport bulk materials as parts of many indu
Jan 1, 2000
-
Alternative Fuels for Pyrometallurgical OperationsThe impact on metallurgical operations of the hydrocarbon energy price hike can be greatly alleviated by recourse to alternative fuels. Information is provided on fuels such as coal, coke, coal-oi
Jan 1, 1981