Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
North 27th Street ISS Extension: Unique Owner/Contractor Agreement Settles Major DisputesBy Donald J. Olson
The North 27th St. ISS Extension tunnel will, under present plans, be the last constructed section of Milwaukee Metropolitan Sewerage District?s (MMSD?s) existing deep tunnel system. The 6.5 m (21 ft)
-
Ressure And Flow Investigation Of An Axial Booster Fan With Variable Blade Settings ? Experimental And Cfd ApproachBy A. Habibi
A study has been undertaken on two 1.12 m diameter industrial booster fans operating under different blade settings powered by a 1200 rpm motor at the Missouri University of Science and Technology. Th
Feb 27, 2013
-
Conveyor Pulley Specifications For AggregatesBy D. Keech
The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 “Welded Steel Conveyor Pulleys” adequately defines standard pulleys for most aggregate material handling applications. How
Jan 1, 2003
-
The application of vertically-mounted jet fans in ventilation shafts for a rail overbuildBy R. E. Ray
Compared to conventional fully ducted axial and centrifugal fan systems, jet fans can offer a number of advantages for control of smoke during fire emergencies and dilution of diesel engine exhaust pr
Jan 1, 2009
-
Majors, Juniors Spur Record Attendance at PDACBy Steve Kral
Good times make for happy miners. And the past few years have seen a lot of smiling mining engineers, geologists, metallurgists, corporate executives, analysts, investment bankers and shareholders.
Jan 1, 2006
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In BostonBy J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
The application of nitrogen to control a spontaneous combustion event during a longwall face salvageBy Leeming. J. R.
In the UK, powered supports are normally salvaged from longwall faces on completion of production, for reuse on the next unit. Where a spare set of supports are held, the salvaged supports are often s
Jan 1, 2009
-
High Performing HMA Design OptimizationBy O. F. Brown
The use of quality materials (aggregates and asphalt binder) in optimal proportions is the key to producing optimally performing hot mix asphalt (HMA). The Superpave mix design standard in the US intr
Jan 1, 2012
-
A New Model For Blast Fragmentation Prediction Based On Multivariate Analysis - IntroductionBy T. Hudaverdi
Several studies have been conducted on blastability and prediction of fragmentation. The term blastability is used to refer the susceptibility of the rock to blasting and is closely related to fragmen
Jan 1, 2011
-
Accurate monitoring and control of flotation cellsBy Carl Pinches
Underground or surface mining is only the first stage in the ore mining process. Once the ore is mined, it is transported to the surface for further processing. Generally, this is done to extract the
Jan 1, 2010
-
Ghana: Gold, Diamonds And MoreBy K. Grubaugh
Ghana’s physiographic and geologic features are the basis for its long mining history. The Gold Coast colony has been a significant producer of gold. The gold of the Akan forest (Ghana) was a terminus
Jan 1, 2001
-
Assessment of equipment operator?s noise exposure in western underground gold and silver minesBy Ellsworth R. Spencer
An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec
Jan 3, 2010
-
Liebherr?s T282 B trucks operating in BrazilIn September, a fleet of 363-t (400-st) Liebherr trucks became operational in Brazil and have already begun moving iron ore in Para state. Prior to the arrival of the the trucks the Brazilian fleet
Jan 1, 2010
-
An Evaluation Of The Strength Of Slender PillarsPillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho
Jan 1, 2006
-
Impact of air velocity and support advance on shield-generated dustSteady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee
Jan 4, 2010
-
The Hallandsås Dual Mode TBMBy Werner Burger
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at
-
Energy Conversion Processes With Intrinsic Co2 SeparationBy R. Leithner
The need/wish to sequestrate CO2is based on the assumption of the International Panel of Climate Change (IPCC), that CO2 maybe the major driver in climatic changes, i.e. especially the anthropogenic C
Jan 1, 2004
-
Field Evaluation of the Coal Dust Explosibility Meter (CDEM) (f4528243-a49d-4f61-b519-915a18b2dfc3)By M. L. Harris
In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) has d
Jan 1, 2008
-
Latest Information on Underground Construction Presented at 2006 NATBy William R. Yernberg
The 2006 North American Tunneling (NAT) Conference was held June 10-15, 2006, in Chicago, IL. The biennial conference was the first NAT conference by the newly formed Underground Construction Associat
Jan 1, 2006
-
Beach Sewer Tunnel Rehabilitation ? IntroductionBy Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008