Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hydrogeological Aspects of Three Open Pits within Noranda Operations

    By L. C. St. Arnaud

    "Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p

    Jan 1, 1990

  • CIM
    Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek Concentrator

    By O. Matwijenko

    "The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi

    Jan 1, 1980

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003

  • CIM
    Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario

    By A. C. Wilson

    In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu

    May 1, 2003

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Gravity Concentration of Gold from Base Metal Flotation Mills

    By M. Ounpuu

    "Gold, because of low head grade and recovery, is usually of minor importance in the economics of base metal flotation mills. Because of the above little metallurgical attention is usually provided to

    Jan 1, 1992

  • CIM
    White Pass and Yukon Route

    By C. J. Brown

    "Access to the outside world is supplied by the Alaska Highway to continental Canada and the United States, the Haines Highway, and by the White Pass & Yukon Route to Skagway and Vancouver. Communitie

    Jan 1, 1973

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    Switched Reluctance Drive: The Ideal Feeder Drive

    By Svato Prochazka

    Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?

    May 1, 2010

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    The Sizing and Operation of Crushing and Screening Plants

    By R. E. Jones

    "Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.

    Jan 1, 1974

  • CIM
    Variation of thermal conductivity of rocks with pressure

    By A. Demirci, A. Keçeciler, Y. S. Durutürk

    "This paper deals with the results of the variation of thermal conductivity of rocks with pressure on a laboratory scale. For this purpose, the authors have added a pressure-supplying unit to the appa

    Jan 1, 2002

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980

  • CIM
    Development of a Mathematical Programming Model to Support the Planning of Short-Term Mining

    By Camilo I. Morales

    At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same

    Oct 1, 2009

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009