Search Documents

Sort by

  • DFI
    Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? Synopsis

    By B. B. Broms

    The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method

    Jan 1, 2010

  • SAIMM
    National And International Codes For Reporting Mineral Resources And Reserves: Their Relevance, Future And Comparison (f3cffa8d-948e-4b88-b85d-9759c7dfe406)

    By F. A. Camisani-Calzolari

    The latter half of the 20th century has seen the proliferation of a series of codes to address commodity needs which were brought about by rapidly advancing technologies and the globalization of marke

    Jan 1, 2004

  • SME
    Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International Airport

    By Mohammad Djavid

    The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo

    Jan 1, 2008

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • SME
    Coal Pillar Strength Based On The Ground Reaction Curve ? A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SAIMM
    Some Aspects On Selective Dispersion Of Fine Particles With Special Emphasis On Egyptian Ground Calcium Carbonate

    By F. H. Abd EL-Rahiem

    A selective dispersion process is presented and the work carried out to find optimum process conditions to minimise the colouring material in ground calcium carbonate (GCC) is described. The feed mate

    Jan 1, 2004

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • AIME
    Application Of Pyrometry To Problems Of Lamp Design And Performance

    By I. H. Van Horn

    IN the development of the incandescent electric lamp one aim of the investigators has been to establish the fundamentals of lamp design, so that the performance of any new lamp may be accurately predi

    Jan 9, 1919

  • CIM
    Robotic Mapping of Underground Drift Networks

    By Unal Artan

    It is well known in the robotics community that the ability to determine the position of vehicles in real time is a key enabling technology required for automation, traffic management, and to ensure s

    Oct 1, 2009

  • AUSIMM
    Confidence Levels In Estimates

    Traditionally, capital costs of major resource development projects have been estimated as a single amount to which a percentage accuracy has been assigned based on the method of preparation of the es

    Jan 1, 1990

  • AIME
    Minerals Beneficiation - The Siphonsizer Deslimer and Classifier

    By L. D. Keller

    The application of hydraulic concentration to large scale operations has been effectively accomplished by the use of the SiphonSizer. Operation has been simple, automatic and essentially trouble free.

    Jan 1, 1963

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • SME
    Protecting Miners from Coal Bursts During Development Above Historic Mine Workings in Harlan County, Kentucky

    In order to reach a large, untapped reserve of high-quality coal, D8 Cloverlick mine proposed to mine a corridor nearly 2,000 ft deep beneath the Benham Spur of Black Mountain, Kentucky’s highest peak

    Jan 7, 2020

  • NIOSH
    IC 9308 Applicability Of Electrical Methods In Deep Detection And Monitoring Of Conductive Lixiviants

    By Jay C. Hanson

    Various electrical and electromagnetic (EM) geophysical techniques are currently being evaluated by the U.S. Bureau of Mines for their effectiveness in the detection and monitoring of electrically con

    Jan 1, 1992

  • NIOSH
    OFR-43-79 Cables For Face Equipment, Standardization Of Requirements

    By R. Stefanko

    This first Annual Report covers the work on Contract No. H0377043 "Cable for Face Equipment", from August 1, 1977 to July 31, 1978. It reports the progress in the three areas of over-and short-circuit

    Jan 1, 1978

  • NIOSH
    RI 8520 Alternative Methods for Copper Recovery From Dump Leach Liquors

    The Bureau of Mines conducted large-scale laboratory copper ore leaching tests to enable improving copper recovery from large dump-leaching operations. This was done by comparing leaching progress whe

    Jan 1, 1981

  • CIM
    Influence of Rock Mass Anisotropy on Tunnel Stability

    Stress induced, gravity-assisted failure processes typically dominate long before stress levels approach the strength of the intact rock (at approximately smax > 0.4UCS where smax = 3s1 ? s3 and UCS i

    May 1, 2009