Search Documents

Sort by

  • AUSIMM
    Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte

    By Abishev D. N, Balakirev V. F, Davydov G. I

    The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol

    Jan 1, 1996

  • AUSIMM
    Native Title and Exploration Access - Where Are We Now and Where Are We Going?

    In June 1992, the High Court of Australia recognised native title of the Meriam people over parts of the Mer Island in the Torres Strait as a form of common law. The Court also indicated that native

    Jan 1, 1996

  • CIM
    Paste Fill Plant Operation at the Louvicourt Mine

    By Benoit Bissonnette

    "The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi

    Jan 1, 1996

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • SME-ICGCM
    Effect Of Specimen Size On Compressive Strength Of Coal

    By A. W. Khair

    Laboratory studies indicate that the specimen size influences the compressive strength of coal significantly. In the past, the diameter/height ratio of coal and rock specimens with different geometry

    Jan 1, 1996

  • CIM
    Mineralogical and process controls on the oxidative acid-leaching of radioactive phases in Elliot Lake, Ontario, uranium ores: II – Brannerite and allied titaniferous assemblages

    By Roy O. Ifill, W. Charle Cooper, Alan H. Clark

    "Queen’s UniversityIn representative, run-of-mine samples from the Panel and New Quirke mines of the Elliot Lake uranium district, Ontario, brannerite, ametamict uranous titanate, occurs in microscopi

    Jan 1, 1996

  • TMS
    The Gas Compositions Calculations on the System of FeS-H2O at Elevated Temperature

    By Guo Xian Jian

    In this paper, the gas composition calculations on the FeS-H20 system at elevated temperature were performed. The results show that the gas constituents are H20, S02, H2S, Sj, H2, and O2 and the order

    Jan 1, 1996

  • SME
    Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling Systems

    By H. Sevim

    Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to

    Jan 1, 1996

  • CIM
    Flooding and loss of the Patience Lake potash mine

    By D. Gendzwill, N. Martin

    "In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou

    Jan 1, 1996

  • RMCMI
    RMCMI Membership (43098795-99a8-4a16-b4cd-ad76889be917)

    Mr. Ronald H. Achziger Midwest Rbr & Sply Co 6404 E 39th Ave Denver, CO 80207 Mr. Randy Acre Acre Management POB 130 Florence, CO 81226 Mr. Brian L. Acton Pacific Basin Resources 7

    Jan 1, 1996

  • AUSIMM
    Measurement of Blast Vibrations: Compliance under the RMA

    With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra

    Jan 1, 1996

  • SME-ICGCM
    Application Of Tomographic Imaging To Stability Assessment

    By Hamid Maleki

    Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r

    Jan 1, 1996

  • SME
    Ventilating and Cooling at Barrick’s Meikle Underground Gold Mine

    By J. van der Walt

    The Meikle Mine is located in the northeastern part of Nevada in the gold-rich Carlin Trend. First discovered in 1989, Meikle is being developed into a 2.2-kt/d (2,500-stpd) underground mine that wil

    Jan 1, 1996

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME-ICGCM
    Identification Of Factors Affecting Horizontal Displacement In Subsidence Process

    By Yi Luo

    In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas

    Jan 1, 1996

  • AUSIMM
    Multiple Source LOTEM Surveys - An Alternative to CSMT Surveys

    By H Bibby

    Initial analysis of Long Offset Time Domain Electromagnetic (LOTEM) data has traditionally been made in terms of early and late time apparent resistivities. By using more than one grounded bipole as a

    Jan 1, 1996

  • TMS
    Sulfatizing Roasting Of Electric-Arc Steelmaking Dusts

    By F. H. A. Abdalla

    A process is described for the recovery of valuable nonferrous metals from steelmaking dust by suiphatizing roasting using ammonium sulphate. Maximum recoveries of soluble metal sulphates achieved at

    Jan 1, 1996

  • ISEE
    A Blasting Plan for Loading Hot Holes

    By John R. Holliday, William Marcum

    Apogee Coal Company, DBA Arch of West Virginia, faced the challenge of drilling and blasting over one million cubic yards of high temperature overburden at its Ruffner surface operation near Logan, We

    Jan 1, 1996

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • AUSIMM
    Historic Gold Dredging on the West Coast

    Slide presentation at conference

    Jan 1, 1996