Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel MatteBy Abishev D. N, Balakirev V. F, Davydov G. I
The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol
Jan 1, 1996
-
Native Title and Exploration Access - Where Are We Now and Where Are We Going?In June 1992, the High Court of Australia recognised native title of the Meriam people over parts of the Mer Island in the Torres Strait as a form of common law. The Court also indicated that native
Jan 1, 1996
-
Paste Fill Plant Operation at the Louvicourt MineBy Benoit Bissonnette
"The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi
Jan 1, 1996
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Effect Of Specimen Size On Compressive Strength Of CoalBy A. W. Khair
Laboratory studies indicate that the specimen size influences the compressive strength of coal significantly. In the past, the diameter/height ratio of coal and rock specimens with different geometry
Jan 1, 1996
-
Mineralogical and process controls on the oxidative acid-leaching of radioactive phases in Elliot Lake, Ontario, uranium ores: II – Brannerite and allied titaniferous assemblagesBy Roy O. Ifill, W. Charle Cooper, Alan H. Clark
"Queen’s UniversityIn representative, run-of-mine samples from the Panel and New Quirke mines of the Elliot Lake uranium district, Ontario, brannerite, ametamict uranous titanate, occurs in microscopi
Jan 1, 1996
-
The Gas Compositions Calculations on the System of FeS-H2O at Elevated TemperatureBy Guo Xian Jian
In this paper, the gas composition calculations on the FeS-H20 system at elevated temperature were performed. The results show that the gas constituents are H20, S02, H2S, Sj, H2, and O2 and the order
Jan 1, 1996
-
Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling SystemsBy H. Sevim
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to
Jan 1, 1996
-
Flooding and loss of the Patience Lake potash mineBy D. Gendzwill, N. Martin
"In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou
Jan 1, 1996
-
RMCMI Membership (43098795-99a8-4a16-b4cd-ad76889be917)Mr. Ronald H. Achziger Midwest Rbr & Sply Co 6404 E 39th Ave Denver, CO 80207 Mr. Randy Acre Acre Management POB 130 Florence, CO 81226 Mr. Brian L. Acton Pacific Basin Resources 7
Jan 1, 1996
-
Measurement of Blast Vibrations: Compliance under the RMAWith the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
Application Of Tomographic Imaging To Stability AssessmentBy Hamid Maleki
Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r
Jan 1, 1996
-
Ventilating and Cooling at Barrick’s Meikle Underground Gold MineBy J. van der Walt
The Meikle Mine is located in the northeastern part of Nevada in the gold-rich Carlin Trend. First discovered in 1989, Meikle is being developed into a 2.2-kt/d (2,500-stpd) underground mine that wil
Jan 1, 1996
-
Geomechanical Support Of Adaptive Mining TechnologyBy I. V. Baklashov
Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad
Jan 1, 1996
-
Identification Of Factors Affecting Horizontal Displacement In Subsidence ProcessBy Yi Luo
In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas
Jan 1, 1996
-
Multiple Source LOTEM Surveys - An Alternative to CSMT SurveysBy H Bibby
Initial analysis of Long Offset Time Domain Electromagnetic (LOTEM) data has traditionally been made in terms of early and late time apparent resistivities. By using more than one grounded bipole as a
Jan 1, 1996
-
Sulfatizing Roasting Of Electric-Arc Steelmaking DustsBy F. H. A. Abdalla
A process is described for the recovery of valuable nonferrous metals from steelmaking dust by suiphatizing roasting using ammonium sulphate. Maximum recoveries of soluble metal sulphates achieved at
Jan 1, 1996
-
A Blasting Plan for Loading Hot HolesBy John R. Holliday, William Marcum
Apogee Coal Company, DBA Arch of West Virginia, faced the challenge of drilling and blasting over one million cubic yards of high temperature overburden at its Ruffner surface operation near Logan, We
Jan 1, 1996
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-