Search Documents

  • NIOSH
    OFR-60-85 Correct Shortcomings During Trial Of Shotcrete Lining System And Demonstrate Shotcrete System

    This report describes the redesign, development and field demonstration of a remote shotcrete lining system, capable of operating in shafts and mines from 8 to 16 feet in diameter at depths up to 1000

    Jan 1, 1983

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • AUSIMM
    Up-Draught Sintering at Port Pirie

    By Adams F. C, Ridley K. L

    Economic conditions after WorId War II made the recovery of Australian sources of sulphur one of considerable national importance. From 1947 to 1949 an investigation was made of recirculation techniqu

    Jan 1, 1956

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • ISEE
    Percussive Drilling Theory and Practice

    By Pat McLaughlin

    Environmental constraints are pushing many operators to change from large rotary blastholes to the smaller diameter holes drilled with down-hole or top-hammer rigs. Productivity improvements over the

    Jan 1, 1995

  • NIOSH
    OFR-123-76 Evaluation Of Underground Conventional Mining Equipment

    By William J. Douglas

    This document describes the development of a conventional mining equipment data base, and an approach for conducting industrial engineering studies of arbitrary mining systems employing network techni

    Jan 1, 1976

  • DFI
    A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results

    By Richard D. Short

    The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field

    Jan 1, 2000

  • SME
    Plant Design, Practice Conference Attracts Processing Specialists

    By William R. Yernberg

    The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by

    Jan 1, 2003

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • SME
    Antiscalants For Gold Processing Applications

    By W. H. Dickinson

    The performance of seven antiscalants spanning a range of chemistries was evaluated for control of calcium carbonate (CaCO3) formation in gold processing applications. Three preferred chemistries were

    Feb 27, 2013

  • CIM
    Ingénierie de la maintenance, de la conception à l?exploitation

    By Turcotte. Yves-Laurent

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • SAIMM
    Scale effect on the geometrical and mechanical properties of rock joints

    By N. Fardin, O. Stephansson, L. Jing

    A pair of silicon rubber replicas of size 250 mm by 250 mm, from a natural rock joint, was used to produce several high strength concrete fracture replicas of different sizes, from 50 mm by 50 mm to 2

    Jan 1, 2003

  • TMS
    Synthesis Of High Performance Limn₀₈ Fe₀₂ Po₄/C Cathode Material For Lithium Ion Batteries: Effect Of Calcination Temperature

    By Enrui Dai, Weibing Chen, Bin Yang, Wenhui Ma, Haisheng Fang, Hui Wang

    LiMn0.8Fe0.2PO4/C composite was prepared by an improved solid-state method and the effect of calcination temperature on properties of the obtained materials was investigated. The results showed that i

    Jan 1, 2015

  • SME
    Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota

    By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington

    EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal

    Jan 1, 2004

  • NIOSH
    OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment

    By Gene R. Reid

    The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p

    Jan 1, 1975