Search Documents

  • ISEE
    Blasting Effects on Pore Pressure in Coal Impoundments (Dry Conditions - Part I)

    By Joshua Micah Hoffman, Jhon Silva-Castro, Kylie Larson-Robl

    A coal mine impoundment failure has the potential to be environmentally devastating and life-threatening. It is well documented that after seismic events slope failures in impoundments can occur. It h

    Jan 1, 2015

  • AUSIMM
    The Metallurgical Treatment of Complex Tin Sulphides

    Were it simply a matter of extracting tin from the simple tin sulphide, the proposition would undoubtedly be simple enough. When, however, other valuable metallic sulphides are combined with the tin,

    Jan 1, 1902

  • CIM
    The Premium Value Defined Growth Independent - Value Creation ? Return On Capital ? Low-Cost Producer ? Return On Assets

    By Phil Keele

    Canadian Natural ??Business Approach Efficiency and Execution ?Drive to be the low cost producer ?Focus on exploitation ?Augment exploitation with strategic acquisitions ?Maintain Discipline and

    May 1, 2010

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SAIMM
    Observed Spatial and Temporal Behaviour of Seismic Rock Mass Response to Blasting

    By K. Woodward

    "SynopsisSeismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial

    Jan 1, 2015

  • SME
    Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and Exploration

    By Tyler Acorn, Brandon Wilson, Jeff Boisvert

    Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc

  • SME
    Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and Exploration (91c0eb25-b83e-4f9f-8ccb-a6f7d555458c)

    By Tyler Acorn, Brandon Wilson, Jeff Boisvert

    Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • SME-ICGCM
    Deformation and failure-time prediction in rock mechanics

    By Barry Voight

    The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately

    Jan 1, 1989

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • AIME
    Rare Metals

    By Donald M. Liddell

    ALTHOUGH the midday lunches of business associations have been re-echoing the phrases that re- search would lead us out of the depression and that the last place to economize is on research, neverthel

    Jan 1, 1933

  • SAIMM
    The Distribution Of Metallic Elements In Granulated Nickel Converter Matte Phases

    By E. L. Thyse

    Keywords: Pyrometallurgy, converter, nickel, matte, distribution Metallic elements occupy a wide range in granulated nickel converter matte phases. The distribution of these metallic elements, pa

    Jan 1, 2011

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • SME
    Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. Coalfields

    By P. Schilizzi, A. Jarosz, M. Karmis

    This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide

    Jan 1, 1986

  • DFI
    Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United States

    By Giovanni A. Bonita

    The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct

    Jan 1, 2006

  • AIME
    Minerals Beneficiation - Copper Recovery from Acid Solutions with Liquid Ion Exchange

    By J. E. House, J. L. Drobnick, R. R. Swanson, D. W. Agers

    The paper describes an improved process for the recovery, purification, and concentration of copper values from acidic dump leach liquors. The process employs a new liquid ion exchange material (LIX®

    Jan 1, 1967

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • SME
    Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development framework

    By Z. Hyder, M. Karmis

    Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.

    Jan 1, 2011