Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead LineBy Axel Preusse
A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate
Jan 1, 2003
-
Design and Field Testing of a Mobile Roof Support for Retreat Mining,By Robert R. Thompson
Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro
Jan 1, 1986
-
A Retrospective Assessment of Ground Control Research and Applications in the Coal IndustryBy Daniel W. H. Su
This paper presents a retrospective assessment of ground control research and its successful application by CONSOL Energy over the past 25 years. Recognizing the need to improve the understanding of c
Jan 1, 2011
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
Longwall Mining Of Thin SeamsBy Ernest A. Curth
An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv
Jan 1, 1981
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
The Introduction of Uk Rockbolting Technology into Coal MinesAround the WorldBy Graham Daws
The introduction of UK rock bolting technology has been applied in many large underground coal mines around the world. This paper explains the methods that have been applied for its successful introdu
Jan 1, 2011
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
A Study on Geotechnical Risks in Interaction Between Open-Pit and Block CavingBy Ezzeddin Bakhtavar
There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f
Jan 1, 2011
-
Prediction of Roof Fall Rate in Coal Mines Using Fuzzy LogicBy Ebrahim Ghasemi
Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred
Jan 1, 2011
-
lnterpanel Barriers for Deep Western U.S. Longwall MiningBy Leo Gilbride
Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma
Jan 1, 2004
-
Quality Management For Grouted RockboltsBy Dieter Wittenberg
The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n
Jan 1, 2000
-
Optimizing Drilling Parameters for Improved Bolting Safety and PerformanceBy Darin Cotton, Tim Burgess, Tim Martin
"As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p
Jan 1, 2015
-
A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal PillarsBy Yunxin Qiu
A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp
Jan 1, 1992
-
Investigation of Seismicity Near Appin, NSW, and its Association With Mining, Geology, and TectonicsBy Vasundhara
A chance detection of a seismic event of unexplained origin in the mining district of Appin in New South Wales. Australia, led to a detailed investigation of recording and analyzing seismic events occ
Jan 1, 2001
-
Design Aspects In Multiple-Seam Mining: Case StudiesBy Gregory J. Chekan
Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i
Jan 1, 1990
-
Time Dependent Strength Of Coal Strata For Long-Term Pillar StabilityBy Z. T. Bieniawski
A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest
Jan 1, 1994
-
Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience And GuidelinesBy Mao Bai
Mining in situations where there exists a potential hazard from inundation has always existed in coal mining, and often reserves were left unmined in favor of reserves with no such hazard. However, in
Jan 1, 1995
-
Controlling Subsidence Effects Using Partial BackfillingBy Yingzin Zhou
Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to
Jan 1, 1990