Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Survey to Better Understand Collegiate Talent for Recruiting PurposesBy Paul Sainato
Recruiting and retaining students in the explosives industry is becoming increasingly important each year. With no undergraduate degree in explosives engineering currently available in the United Stat
Jan 1, 2016
-
Blasting Program Optimization with Emphasis on the Control of Blast Vibration and AirblastBy Frank Sames
Most Blasting Programs are developed focussing on the environmental impact with respect to blast vibration and airblast. Compliance with existing regulations or policies limiting the immissions are ge
Jan 1, 2000
-
Advanced Blast Modeling for Mining Steeply Dipping Coal SeamsBy Dan L'Heureux, Joe Haid, Stephen H. Chung
Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast
Jan 1, 1998
-
Applications of Metrics to Blast DesignsBy Thomas Hans Kleine
In general the software required by a blast designer includes tools that graphically present blast designs (surface & underground), can analyze a design or predict its result, and can assess blasting
Jan 1, 1995
-
Methods of Evaluating and Predicting FragmentationBy Claude Cunningham
The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage
Jan 1, 1995
-
Demonstrating Competence from Charge Hands to Chartered EngineersBy Ken Cross
This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a
Jan 1, 2013
-
Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)By Jack Eloranta
This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!as
Jan 1, 1995
-
Proactive Waste Minimization Initiatives for Energetic Waste SitesBy T Barnes, K D. Sexton, T J. Tope
For the past decade, the U.S. Department of Defense (DoD) has been under increasing pressure from state and federal regulatory authorities to develop management strategies for waste streams generated
Jan 1, 1997
-
Interpreting Continuous Velocity of Detonation MeasurementsBy Bruce Vandenberg
Two tests were set up as part of the course given by Blasting Analysis International. Both tests were performed using the prototype Velocity of Detonation Recorder (VODR). The prototype has several li
Jan 1, 1990
-
Shock Waves and Detonations, Explosive Performance (Tiger Code Theory)By Per-Anders Persson
This chapter deals with the concepts ofshock waves aud detonation waves together, because a detonation wave is really a shock wave, supported by the explosive reaction that the shock wave ignites and
Jan 1, 1994
-
Underwater Blasting and Train-induced Ground Vibrations on 80 Years-old BuildingBy Paulo José Costa Couceiro Junior, Manuel Lopez Cano
In 2011, two historic outcrop rocks known as Teffé and Itapema located in the navigation channel of the Port of Santos, Brazil (Latin America’s largest port) – were excavated by drilling and blasting
Jan 1, 2016
-
Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground VibrationsBy W. J. Birch, R. Farnfield
The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa
Jan 1, 2009
-
Application of Non-Newtonian Fluid Mixture for Stemming Performance OptimizationBy Braden Lusk, Paul Sainato, Josh Calnan, Hiago Vasconcelos, Luis Felipe Marinho
"Blasting and rock fragmentation is one the most important unit operations in mining. Since itsintroduction into the mine production cycle, mining has become more efficient in mineral production(Hartm
Jan 1, 2016
-
Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM ModelsBy Alejandro Ferrada Vergara, Héctor Espinoza Muñoz
Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ
Jan 1, 2016
-
Evaluating Delay Effects on Ground Vibrations with Simulated Vibration WaveformsBy Randall M. Wheeler
It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for
Jan 1, 1994
-
Practical Aspects of GPS Positioning and Equipment Monitoring Technology in Drilling and BlastingBy Carl Hendricks
Aquila Mining Systems Ltd., is the world leader in drill monitoring, control and GPS-based machine navigation systems for the mining industry. This paper will review the design and application of AQUI
Jan 1, 2000
-
A Model for Near and Farfield Blast Vibration Based on Multiple Seed Waveforms and Transfer FunctionsBy D. Scott Scovira, Ruilin Yang
Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field
Jan 1, 2010
-
Liquid Propellant TechnologyBy Stanley Griff, William Herrera, William O. Seals
"The Navy initiated liquid propellant research in the early 1940's. The first promising Navy liquid propellant, Otto Fuel II, was developd in the early 1950 as a potential torpedo fuel. Later, the Nav
Jan 1, 1990
-
Crater Blasting Techniques and Designs in Compacted SoilsBy Patrick D. McLaughlin
Crater blasting techniques have had relatively little application in the surface mining industry. This is not surprising, considering the geometry required to efficiently use cratering. The more widel
Jan 1, 1992
-
Tunnel Excavation on the Abutment of an Existing DamTo meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint
Jan 1, 2016