Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault ZoneBy Steven D. Scherer
The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern
Jan 1, 2001
-
A Non Linear Fractal Model for the Analysis of Pile FoundationsBy Paola Campana, Maurizio Lenzi
"In the paper a non linear model for the analysis of the pile response to the axial loads is presented. The study aims to find a general analytical solution concerning the pile-soil interaction modele
Jan 1, 2017
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Performance of Foundation Systems in ChicagoBy William (Bill) H. Walton
"I arrived in Chicago in 1993 with Dr. Ralph Peck’s University of Illinois bulletin titled Engineering Properties of Chicago Subsoils (Bulletin 429), which he published in 1954 with William Reed. Bein
Jan 1, 2017
-
Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element ModellingBy Vijaya R, Boominathan A
The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p
Sep 1, 2022
-
Underpinning Historic Museum for U-505 Submarine RelocationBy Goudschaal Mark R.
"The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This
Jan 1, 2005
-
Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey
"Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility
Jan 1, 2017
-
Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore StructuresBy Chul Soo Park, Juhyung Lee, Duhyun Baek
"In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl
Jan 1, 2017
-
Thirty Years of Experience with the Wave Equation Solution Based on the Method of CharacteristicsBy Peter Middendorp, Gerald E. H. Verbeek
"This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o
Jan 1, 2005
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - OutlineBy Les R. Chernauskas
? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T
Jan 1, 2001
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty ClayBy Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang
"A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we
Jan 1, 2005
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction EffectsBy Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in TurkeyBy Arash Khosravifar, Amalia Giannakou
"Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d
Jan 1, 2017