Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Evaluation Of Degree Of Overconservatism In Api Shaft Friction Of Piles In Marine Sand Of The Arabian GulfBy Ahmed H. Bukhary, Naser A. Al-Shayea
The objective is to assess the overconservatism in the parameters used for designing offshore piles. Methodology includes analysis of shaft friction data obtained from more than five different locatio
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Laboratory Validation Of In-Situ Tests - 1. IntroductionThis paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
Bearing And Friction Design Capacity Software For Helical Anchors And PilesBy Gary L. Seider
Chance, a Division of Hubbell Power Systems, Inc., in conjunction with Sailors Engineering, Inc. has updated its Helical Design Capacity Software. This latest version, ?HeliCAP® v2.0?, is a state-of-
Jan 1, 2007
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Innovative Drilled Shaft Installation Process Through Existing Bridge FoundationsBy Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Seismoacoustic Effects Of Driving Large Diameter Piles ? SummaryBy Barry C. Roth
Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground
Jan 1, 2001
-
Seven Mile Dam Retrofit - A Global ChallengeBy Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
An Active Soil Nail Wall Underpinning SolutionBy Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
A Method For Predicting Load-Settlement Relationship And Bearing Capacity Of Single Piles By Means Of CPTBy Wang Huichang
A tentative mathod for predicting load-settlement relationship and bearing capacity of single piles based directly on the results measured by cone penetrometer with local friction sleeve is presented
Jan 1, 1991
-
2023 OPA Winner: Climate Pledge ArenaBy Meeok Kim, Thornton Tomasetti, Seth Knihtila, Michael Oakland, Shawn Leary
The transformation of Seattle's historic KeyArena into the state-of-the-art Climate Pledge Arena, home to the NHL's Seattle Kraken, was no small feat. The $930-million renovation and expansion require
Sep 1, 2023
-
Drilled Shaft In Strong Rock-Design, Validation, And Construction Of The Beauharnois Canal Bridge, Autoroute 30 MontréalBy Ivan Hee
The 2.5km long bridge over the Beauharnois Canal and St. Lawrence Seaway is a major structure in the new Autoroute 30 project near Montreal. Foundations for the bridge consist of footings on bedrock,
Jan 1, 2011
-
2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test ProgramBy Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Implementation Of Alternative Deep Foundation SystemsBy Ray Zelinski
Caltrans sponsored a research project in 1992 which incorporated proprietary and generic pile types. The piles were subjected to axial tensile/compressive loads in deep, soft soils. Descriptions of va
Jan 1, 1993
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China (325b7cc0-aff5-4a88-9f69-cd3dc2f57f1d)By Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
A Geotechnical Instrumentation Case StudyBy Mehih Demirkan, Kevin Tehansky
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat
Apr 1, 2023