Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil MixingBy Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden
Jan 1, 2014
-
First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? IntroductionBy Gordon King
The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil
Jan 1, 2004
-
Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of CanadaBy Richard Deakin
This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and
Jan 1, 2011
-
Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998By David A. Jack
The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa
Jan 1, 1998
-
Resolution Of Prestressed Concrete Pile Splice Problems - SummaryBy David Siu
Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea
Jan 1, 1991
-
High Capacity Barrettes In A Region Of Old Underground QuarriesBy F. Schlosser
The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz
Jan 1, 1989
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
Load Testing Of Deep Foundations Using The Osterberg Load CellBy David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - IntroductionBy F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test DataBy Ramin Motamed, Joseph A. W. Toth
Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte
Jan 1, 2018
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Use Of Controlled Modulus Columns In Retail & Industrial Development ProjectsBy Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Basement Excavation: Cost Effective Retention System for a Multi Storeyed StructureBy Madan Kumar Annam, Hari Krishna Y
"Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted
Jan 1, 2015
-
Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:By B. Ramanathan
The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed
Jan 1, 1996
-
Residual Loads Measurements in Driven Steel H-PilesBy Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017