Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine

    By Dean S. Rogers

    "In February 1980, Dome Mines Limited announced a $50 million expansion program which would result in a 50% increase in mill capacity from the present 1,815 tonnes per day to an eventual production ra

    Jan 1, 1982

  • CIM
    Benefits of Pillar Destressing in Narrow Vein Mining

    By Hani S. Mitri

    Overhand cut-and-fill mining of narrow vein orebodies inevitably leads to the creation of horizontal pillars. As the thickness of the overlying crown pillar diminishes, stresses build up in the pillar

    Oct 1, 2001

  • CIM
    Inco's design and protection against underground fires

    By J. S. Stachulak

    "The main ventilation design features adopted at Inco to safeguard personnel against the effects of fires are described in this paper. Measures taken to prevent and detect fires due to spontaneous com

    Jan 1, 1994

  • CIM
    Inco's design and protection against underground fires (1c018f14-712e-46fb-b5a8-17714a5a87a5)

    By J. S. Stacbulak

    "The main ventilation design features adopted at Inco to safeguard personnel against the effects of fires are described in this paper. Measures taken to prevent and detect fires due to spontaneous com

    Jan 1, 1994

  • CIM
    Continuous Improvement of the Return Air Raise Silencer System at Totten Mine

    By Andrew Dobson, Cheryl Allen, Enrique Acuña

    "Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p

    Jan 1, 2019

  • CIM
    Electrical Demand Reduction and Response Strategies for Underground Mining

    By Nicholas C. Williams

    This paper presents the development of a demand reduction and responsive strategy capable of reducing the electrical power demand, particularly during peak conditions. The work presented includes a ca

    Aug 1, 2013

  • CIM
    Automated Decision Support System for Optimizing the Selection of Green Building Measures

    By Moatassem Abdallah

    Buildings in the United States account for 72% of electricity consumption, 40% of energy consumption, 13% of water consumption, 39% of carbon footprint, and 30% of waste output. In order to minimize t

    Aug 1, 2013

  • CIM
    Multi-Point Concurrent Tracking and Surveying in Construction Field

    By S. Mao

    Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends

    Aug 1, 2013

  • CIM
    Solving Old Problems with New Weapons

    By D. Runnels, A. Allaire, J. Torrealba-Vargas

    Data mining and modelling of operational data involves the discovery of patterns in large datasets for future use in benchmarking and plant optimization. The modern pattern of discovery in large data

    Jan 1, 2019

  • CIM
    Aids to design for coal preparation plants

    By D. G. Osborne

    "The paper describes current 'tools' available to the coal preparation engineer for carrying out the evaluation of data, process design, selection of equipment and layout and design of coal

    Jan 1, 1985

  • CIM
    Silica-Kaolin Deposits of Algocen Mines Limited

    By D. E. Smith, M. K. Murthy

    "The commercial potential of a silica-kaolin deposit that occurs on the banks of and close to the Missinaibi River in the District of Cochrane, Ontario, is under evaluation by Algocen Mines Limited. T

    Jan 1, 1970

  • CIM
    Central Steam-Heating in Winnipeg

    By J. W. Sanger

    The establishment of a central steam-heating system in Winnipeg and its inauguration in October, 1924, has attracted a considerable amount of attention. Not only does it excite the curiosity of the en

    Jan 1, 1926

  • CIM
    Development of Representative Assembly for the Fabrication of Cold Ramming Paste Samples at Laboratory

    By S. Orangi

    A representative sample of ramming paste from a peripheral seam in an aluminium electrolysis cell was taken in order to develop a process to fabricate ramming paste samples in the laboratory. To this

    Jan 1, 2011

  • CIM
    Ore Pre-Concentration by Bulk Sorting Using Real Time Elemental Analysis

    "Conveyed coal flows have been diverted on the basis of real time ash analysis since the 1980s. Many coarse particle separation methods are available through screens, jigs, heavy media separation, par

    Jan 1, 2018

  • CIM
    Moving Towards a Reliable Assessment of Deformability of Rock Masses: Examples from Large Dams Foundations

    By S. Ianos, C. Vibert

    Type and shape of large dams founded on rock depend upon the expected deformation of their foundation. Their design consequently requires the assessment of the deformability of the rock mass at large

    Jan 1, 2015

  • CIM
    Arctic mineral wealth: Equitable participation with aboriginal landowners — a slow or fast process?

    By Donald E. Wakefeld

    "The pace at which mining will occur in Northern regions and Arctic lands will depend on the answers to a number of questions. Who are the local aboriginal participants? What land uses are they pursui

    Jan 1, 1996

  • CIM
    Effect of Various Additives on Valuable Metals Recovery from Copper Cliff Converter Slag

    By A. Mitrašinovic, A. Wolf

    "The aim of this investigation was to determine the most suitable additive for recovering metals from converter slags generated during Ni extraction. Fluxes analyzed were silica and lime and reductant

    Jan 1, 2015

  • CIM
    Learnings from Infrastructure Replacement within an Operating Refinery

    By L. Trytten, S. Bass, P. Nawrocki, J. Mercer

    The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am

    Jan 1, 2015

  • CIM
    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Production of Ultrafine Ferrite Using Designed Experiments

    By D. K. Matlock, D. J. Hamre, J. G. Speer

    Ultrafine ferrite (UFF) grains may be produced in surface layers of plate steels using controlled intermediate cooling followed by deformation. Experiments were conducted using a 0.12 C - 1.26 Mn stee

    Jan 1, 2004