The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine

Canadian Institute of Mining, Metallurgy and Petroleum
Dean S. Rogers
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
8
File Size:
1193 KB
Publication Date:
Jan 1, 1982

Abstract

"In February 1980, Dome Mines Limited announced a $50 million expansion program which would result in a 50% increase in mill capacity from the present 1,815 tonnes per day to an eventual production rate of 2, 720 tonnes per day in the year 1984. As an integral and necessary part of this planned expansion, a new vertical production shaft, No. 8 Shaft, would be sunk from surface to a depth of 1,645 metres.Throughout the seventy-year history of mining at the Dome, gold has been found in a number of different rock types and in association with a number of different structural settings. However, the key to successfully locating ore deposits lies in the recognition of the favourable environments in which they generally occur. First and foremost, the exercise of locating the No. 8 shaft became an exercise in geological deduction based on the projection of these favourable lithologic environments.In November 1980, after detailed engineering work was completed, the total cost of the project was estimated at $75.5 million 1980 dollars or $91 million dollars allowing for inflation over a four-year construction period. These estimates include the shaft, significant replacement and alterations to the milling process, and an upgrading of the plant."
Citation

APA: Dean S. Rogers  (1982)  The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine

MLA: Dean S. Rogers The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 1982.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account