Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • CIM
    Waste Rock Disposal to Improve the Geotechnical and Geochemical Stability of Piles

    Waste rock extracted from a mine is typically stored nearby on the surface. Such waste rock piles must be designed to ensure their geotechnical and geochemical stability during the mine operation and

    Aug 1, 2013

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Optimization of Acid Consumption for Copper Heap Leaching

    By Anand Raman, Steve Dixon

    "Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the

    Jan 1, 2008

  • CIM
    Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi

    Jan 1, 2007

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Kupol Mill Leach Operation In 2008-09

    By G. Kolosay, J. Rajala, G. Deschênes, A. Romanov

    ABSTRACT: The Kupol project, located in Far East Russia, treats a high-grade, free-milling ore containing 25.5 g/t Au, 298.3 g/t Ag, and 0.5% pyrite,with a P70of 53 microns. Most of the gold occurs as

    Jan 1, 2011

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Flotation of the Major Copper Sulphide Minerals – An Electrochemical Viewpoint

    By A. R. Barnes, N. O. Lotter

    Recoverable economic copper sulphide minerals such as chalcopyrite, bornite, chalcocite and covellite often occur together in varying proportions in the major copper-bearing ores, and have individual

    Jan 1, 2016

  • CIM
    pH Control of Mattagami Lake and Orchan Mines Effluents

    By K. G. Stowe

    "1. Introduction Mattagami Lake Mines and Orchan Mines operate zinc copper mines adjacent to one another near Matagami, Quebec, situated approximately 300 kilometres north-east of Rouyn-Noranda. (Note

    Jan 1, 1979

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • CIM
    Rate Dependence of Flexural Tensile Strength of Laurentian Granite

    By F. Dai

    Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:

    May 1, 2009

  • CIM
    Screening Peptide-Ore Interactions with a Phage Display Library for Bioflotation Application

    By A. Garnier, K. Tremblay-Bouliane, B. Gaillet, S. Moineau, D. Tremblay

    "A heptapeptide library displayed on M13 bacteriophages (phages) was screened to identify peptide sequences able to selectively bind to gold, chalcopyrite, sphalerite, pyrite, and silica ores, and to

    Jan 1, 2016

  • CIM
    Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill

    By Kim Le Roux

    Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:

    May 1, 2002

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009