Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Variation of Thermoelectric Power of Particulate Pyrite during Oxidative Leaching

    By Kametani H

    Since pyrite is a semiconductor, the relationship between the leaching rate and the semiconducting properties is of interest. In order to investigate this relationship, a pyrite concentrate (95% F

    Jan 1, 1987

  • AUSIMM
    Controls on Gold Mineralisation in the Pine Creek Geosyncline

    By Eupene GS

    The Early Proterozioc Pine Creek Geosyncline hosts a large number of gold showings. Mineralisation types include stratiform, synsedimentary deposits within iron formation and carbonaceous mudstone

    Jan 1, 1984

  • AUSIMM
    Iron Island, Queensland.

    By Campbell Brown G A

    IN 1904-5 diamond drilling operations in the Mount Morgan mine proved the presence of some millions of tons of rich copper-gold ore, averaging about 45%to 50%silica and 22%Fe as sulphide. To smelt thi

    Jan 1, 1911

  • AUSIMM
    A practical simulation of an industrial rougher flotation circuit

    By Osborn G

    The bulk flotation behaviour of an industrial rougher bank has been determined with a view to characterising the size iepend ent behaviour of the identifiable nineral groups present. A relatively

    Jan 1, 1986

  • AUSIMM
    Numeric Modelling of Fluid Flow, Heat Transfer and Combustion in the Kalgoorlie Nickel Smelter

    By Koh P. T L, Varnas S. R

    Fluid flow, heat transfer and combustion in a nickel flash smelter have been investigated by numerical modelling and flow visualisation. The three-dimensional numerical model incorporates turbulent

    Jan 1, 1992

  • AUSIMM
    Applied Designs of Rubber Mill Liners for Different Conditions and Maximum Efficiency

    There is a difference in design aspects between steel linings and rubber linings for grinding mills. The basic design rules for rub- ber are described as well as the liner designs for different appli

    Jan 1, 1978

  • AUSIMM
    Fatigue Resistant Design and Repair of Dynamically Loaded Structures

    By Scales PJ

    Fatigue is the primary cause of failure of structural and mechanical components subject to dynamic loading. Recognition of this basic fact and the development of appropriate techniques and details

    Jan 1, 1982

  • AUSIMM
    New Developments in Manganese Module Prospects, with Emphasis on the Australasian Region

    By Colwell JB, Cronan DS

    Manganese nodules cover great areas of deep ocean floor far from land, and have long been considered a major potential resource of nickel, copper, cobalt and perhaps manganese. A decade ago there was

    Jan 1, 1990

  • AUSIMM
    Filling Operations at Mount Isa

    By Hunter GW

    This paper gives an account of the filling system at Mount Isa from surface fill production to stope discharge underground. A brief explanation of the surface facility and reticulation is given pr

    Jan 1, 1982

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • AUSIMM
    The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel Intersections

    By Hocking G

    For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D

    Jan 1, 1976

  • AUSIMM
    Mine Geology from a Geotechnical Perspective

    This paper addresses the role of mine geology in mining geotechnics. The role is assessed and discussed in terms of five main elements; geotechnical complexity, geological complexity, mine scale, perc

    Jan 1, 1993

  • AUSIMM
    Evolution of Pillar Mining at the Pasminco Mining Broken Hill Operations Southern Operations

    Pillar mining methods at the Pasminco Mining Broken Hill Operations are not new. Since mining commenced on Pasminco's leases at the turn of the century virtually every pillar extraction method tr

    Jan 1, 1992

  • AUSIMM
    A Study of Competing Process Requirements in a Complex Tin Concentrator

    By Weller K. R, Stewart P. S B, Restarick C. J

    The performance of the Renison tin concentrator was assessed in detail for two arrangements of the three available ball mills. With two mills used for primary grinding and the third for regrinding t

    Jan 1, 1977

  • AUSIMM
    Geology of Teutonic Bore Massive Sulphide Deposit, Western Australia

    The Teutonic Bore deposit lies in a major greenstone belt within the Archaean Yilgarn craton of Western Australia. It occurs towards the base of a suite of tholeiitic basalts, some 100 m above a felsi

    Jan 1, 1984

  • AUSIMM
    Grade Control Procedures at the Iron Prince Quarry Whyalla, South Australia

    The Iron Prince orebody occurs within the Lower Middleback Jaspilite Horizon of the Middleback Group and consists of hematite within host rocks of jaspilites and schists. The ore was probably the pr

    Jan 1, 1971

  • AUSIMM
    The Relationship between Blasting Parameters and Muck Pile Configuration

    By D Van Doorselaere

    The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e

    Aug 24, 2015

  • AUSIMM
    Mining-Hydrological Characteristics of the Underground Copper Mine of Neves-Corvo, Portugal

    By Real F, Carvalho P

    During the development of the Neves-Corvo Underground Copper Mine, since 1981, inflow of water has been encountered in the mine workings, which consist of a ramp from surface 5 km long, a shaft 575

    Jan 1, 1988

  • AUSIMM
    A New Method for Estimating the Full-Scale Grind Target for Flotation from Laboratory Batch Grinding and Flotation and Reference Full-Scale Tests

    By Liu Y, Campbell K. R

    The paper shows how breakage parameters may he extracted from laboratory batch grinding results and how they may used with reference full-scale hall mill circuit data to estimate the likely size dis

    Jan 1, 1997

  • AUSIMM
    Gateroad Development - The Correct Method, the Correct Equipment?

    Longwall mining in Australia is approaching maturity. Longwall production from 'state of the art' Australian longwall mines now rivals similar US based longwall operations. Regrettably howev

    Jan 1, 1998