Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Fragmenting Oversize Boulders

    By J Mensah, G C. Sen

    Often large boulders of rock have to be fragmented in civil or mining engineering operations. These oversize boulders are encountered after primary blasts in both surface and underground excavations o

    Jan 1, 1989

  • ISEE
    Overbreak Control in VCR Stopes at the Homestake Mine

    By Virgil J. Stachura, Larry R. Fletcher, Paul V. Sterk, Matthew N. Plis

    The large diameter blastholes now being used in underground mining have caused concern because of their increased potential for damaging openings and creating rockfall hazards. In response to this sit

    Jan 1, 1991

  • ISEE
    Blasting Techniques to Control Roof Failure in an Underground Limestone Mine

    By Mike Koehler

    An underground mine that produces aggregate limestone was in operation for approximately eight years when geological changes resulted in dangerous rock falls. The roof in the mine was not bolted; ther

    Jan 1, 2002

  • ISEE
    Backstoping with Millisecond Delay Timing at the Sunshine Mine, Kellogg, Idaho

    By Dale Nies

    In the past, cap and fuse has been the only economical and efficient initiation system capable of providing sequential timing, ease of loading and hookup, and unlimited borehole number for backstope r

    Jan 1, 1989

  • ISEE
    Development and Field-Test of Low Density ANFO

    By S. Nakamura, H. Taniguchi, K. Noguchi, H. Sugihara, T. Matsuzawa

    It has been reported that expanded poIystyrene and ANFO prills ‘were mixed on a blasting site for controlled blasting (ISANOL). Although there seems to be few possibility of their segregation because

    Jan 1, 2001

  • ISEE
    Effect of Joint Separation and Filling on Pre-Split Blasting

    By Shijie Qu, Paul N. Worsey

    Pre-splitting has become widely adopted for the formation and protection of final surface rock excavation profiles in both large scale civil construction and highway rock cuts. Jointing has been shown

    Jan 1, 1987

  • ISEE
    The History of Perimiter Blasting at the Homestake Mine

    By Justus Deen, Paul Sterk

    Overbreak into the wall rock of a development drift leads to the inevitable need to rehabilitate a drift. Moreover, overbreak in a production heading can lead to external dilution and lower ore grades

    Jan 1, 1997

  • ISEE
    Cast Blasting Around Town

    By Jeff Wachendorf

    As the title "Cast Blasting Around Town" implies, this paper details the starting of a cast blasting program in and around the town of Colstrip, Montana. As strip ratios have increased, the need to ad

    Jan 1, 2009

  • ISEE
    The Engineering Significance of Shrinkage and Swelling Soils in Blast Damage Investigations

    By Wendell W. Harris, Stanley J. Vitton

    In the United States each year it has been estimated that expansive soils cause approximately $9.0 billion in damage to buildings, roads, airports, and other facilities. This figure alone exceeds the

    Jan 1, 1996

  • ISEE
    Explosives in Electric Power Distribution

    By James Stuart

    Explosive components are common in electric power distribution systems. Basically, we use explosives either to open or to close a circuit very quickly, in order to avoid electrical catastrophe. We use

    Jan 1, 2009

  • ISEE
    Blasting Accidents in Underground Mines a Two Decade Summary

    By Harry Verakis, Thomas Lobb

    This paper is a summary and an update of the underground mine blasting accident investigations and studies previously conducted by the Mine Safety and Health Administration (MSHA) and the former US. B

    Jan 1, 2002

  • ISEE
    Explosion Bonded Electric Products and Explosion Cutting of Retired Nuclear Installations Pipes

    By Hu Wenjun

    This paper changes the section of copper of copper to aluminum adapter bar into aluminum plate covered one face or double face with copper coat, and changes the conductor material of knife switch, fus

    Jan 1, 2000

  • ISEE
    Determination of the Initiating Strength of Commercial Detonators Using an Explosive of Adjustable Sensitivity

    By J Edmund Hay

    Previous work by the Bureau of Mines to develop a test for determining the initiating strength of commercial detonators has been modified and extended. Recently reported results by the Bureau used a

    Jan 1, 1993

  • ISEE
    Production Blasting at the Empire Mine

    By G J. Kulbieda

    The Empire Mine initiated production in 1963. Since then the unit operations of drilling and blasting have evolved continually in order to meet the increased mining requirements demanded by plant expa

    Jan 1, 1981

  • ISEE
    Seismic Study of the Dynamic Response of Rock to Cylindrical Charges Fired in a Half and a Quarter Space Geometry

    By Sharon K. Reamer, Klaus G. Hinzen

    A series of controlled seismic experiments was performed in a limestone quarry in southern Germany to study seismic effects of cylindrical charges fired in both a half space (HS) (burden 63 m) and qua

    Jan 1, 1991

  • ISEE
    Computer Assisted Blast Design and Assessment Tools

    By Thomas H. Kleine, Alan R. Cameron, William W. Forsyth

    In general the software required by a blast designer includes tools that graphically present blast designs (surface & underground), can analyze a design or predict its result, and can assess blasting

    Jan 1, 1995

  • ISEE
    Aluminized Blasting Agents

    By Albert G. Funk, Gary M. Thornley

    The available energy of aluminized ANFO and aluminized slurry blasting agents has been measured by seismic methods, calculated theoretically, and compared. With aluminized ANFO it is concluded that al

    Jan 1, 1981

  • ISEE
    So You Think You Are Monitoring Peak Particle Velocity

    By R A. Farnfield

    Measurement of the environmental impact of ground vibration from blasting operations is based almost exclusively on the peak vibration level generated. This measurement is known as the Peak Particle V

    Jan 1, 1996

  • ISEE
    Complying with Sara-Title III: The Community Right-to-Know Act as a Non-Manufacturing Facility

    By Douglas R. Burns

    Complying with SARA-Title III and the Emergency Planning and Community Right-To-Know Act as a Non-Manufacturing Facility. As of August 23, 1988 non-manufacturing facilities storing end using chemicals

    Jan 1, 1989

  • ISEE
    MINIMIZING RISK IN URBAN QUARRIES (Two Case Studies)

    By James Goldberg, Sally Zadra, Wiliam Reisz

    Early recognition and risk assessment is critical to sustaining a safe and productive blasting operation. While every blasting environment holds inherent risk, highwall blasting in highly congested ar

    Jan 1, 2008