Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Wharf Damage Due To Settlement Of Deep Soft Subsoil ? SynopsisBy Z. Y. Ding
This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa
Jan 1, 1991
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore FoundationsBy Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck
Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo
Nov 1, 2022
-
Jet Grouting Underpinning Of A Building In The USBy Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Application of Multiple Excavation Support Systems in Brown Field ProjectBy Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with
Jan 1, 2017
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009
-
Earth Retention Systems In The Urban Environment - Special ConsiderationsBy George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Regulations Of Construction VibrationsBy Mark R. Svinkin
Regulations are needed to keep construction vibrations in tolerable limits. The existing regulations were developed for low-rise residential structures, but they are incorrectly used for different sup
Jan 1, 2006
-
Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation ProjectsBy Martin B. Hudson, Daniel Brescia, Zhangwei Ning
Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea
Jan 1, 2018
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Doyle Drive - Extreme Pile InstallationBy Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - IntroductionBy P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial SeawallBy Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
-
Pile Integrity Testing In The NetherlandsBy Peter Middendorp
Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int
Jan 1, 2006
-
Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil ParametersBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge (16c93b01-e1c3-48e5-bd32-54e8ea2106cb)By Robb L. Swenson
Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of
Jan 1, 2013
-
Prediction And Performance Of Drilled Shafts Constructed Under SlurryBy Clyde N. Baker
The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res
Jan 1, 1991
-
Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? IntroductionBy Geoffrey C. Hebner
Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr
Jan 1, 2003