Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Bentonite Self-Hardening Slurry Mix Variations and Field Implementation Methods

    By Christopher R. Harris

    "Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo

    Jan 1, 2016

  • DFI
    Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining Walls

    By Pawan L. Sethi

    Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal

    Nov 1, 2022

  • DFI
    ACIP Pile Performance and Installation in the Northeastern United States

    By Jr NeSmith

    "Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile

    Jan 1, 2016

  • DFI
    St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program

    By Jeffrey A. Gebhard

    As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes

    Jan 1, 2009

  • DFI
    Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case Study

    By Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli

    "The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the

    Jan 1, 2016

  • DFI
    Analysis and Behavior of Double Sheet Pile Cofferdam

    By Kamil Nuzha, Jianchao Li, Bashar S. Qubain

    "The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we

    Jan 1, 2016

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022

  • DFI
    Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft Foundation

    By P. Seethalakshmi, Yatakuri Yaswanth Naidu

    The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye

    Sep 1, 2022

  • DFI
    Noise Attenuation and Reduced Risk Associated With New Double- Walled Pile Technology

    By Julie H. N. Hampden, Per G. Reinhall

    "Executive summary: Impact pile driving of steel piles is a common construction practice in freshwater and marine environments for the building of structures and foundations. This practice produces ex

    Jan 1, 2017

  • DFI
    Evaluation Of Causes Of Bleeding Of Free Water From A Bentonite Slurry

    By Tony P. Suckling

    This paper describes an investigation into the bleeding behaviour of bentonite slurry observed on a trial diaphragm wall panel. The bleeding is thought to be due to the bentonite experiencing a chemi

    Jan 1, 2011

  • DFI
    Drilled Shaft In Strong Rock-Design, Validation, And Construction Of The Beauharnois Canal Bridge, Autoroute 30 Montréal

    By Ivan Hee

    The 2.5km long bridge over the Beauharnois Canal and St. Lawrence Seaway is a major structure in the new Autoroute 30 project near Montreal. Foundations for the bridge consist of footings on bedrock,

    Jan 1, 2011

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017

  • DFI
    Innovative Design for Retaining Structures using Combined Products

    By Clifford Taylor, Alexander Zöhrer

    "The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such

    Jan 1, 1900

  • DFI
    A Decade of Experience with Drilled Foundations in Honolulu

    By James W. Niehoff

    "Prior to 2003, most high rise structures in Honolulu, Hawaii were supported on driven pile foundations, extending through shallow coral strata and bearing in competent formations at depths of 100 ft

    Jan 1, 2016

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Design, Specification And Installation Of Square Shaft Helical Piers In Expansive Soils

    By John S. Pack

    The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and

    Jan 1, 2007

  • DFI
    Drilled Displacement Piles in the Northeastern United States

    By Jr NeSmith

    "Drilled Displacement piles are a product of screw pile technology originally developed in Europe. The process involves rotating tool into the ground that displaces the soil laterally as it advances,

    Jan 1, 2016

  • DFI
    Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam

    By Jamey Rosen, Georgette Hlepas

    "Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement

    Jan 1, 2016

  • DFI
    Numerical Analysis Of The Osterberg Cell Loading Test

    By Brunella Recinto

    Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large

    Jan 1, 2003

  • DFI
    Tresfjord Bridge -Pile Works

    By Andreas Andenæs, Arne Schram Simonsen

    "AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises

    Jan 1, 2014