Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Effective Life-of-mine Planning by Understanding and Managing Risks and Opportunities Associated with Geological UncertaintyBy M Berry
Consider these four questions:What is the definition of life-of-mine?When should life-of-mine planning seriously commence?When can life-of-mine planning seriously commence?What is the key input to eff
Jul 16, 2014
-
Carbon kiln selection, operation and maintenanceBy J K. Claflin, S R. La Brooy, A M. Claflin
Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad
Aug 29, 2018
-
Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in MongoliaBy I Swane, R Rait, A Robertson
Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static
Sep 29, 2013
-
Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.By W. M. LONIE
Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc
Jan 1, 1979
-
Driving Haulage Productivity Improvements through Industry–Academia CollaborationBy R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch
"The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e
Nov 15, 2016
-
Blast Design and Vibration Control at Kayad Lead-Zinc Underground MineBy P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi
Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u
Aug 24, 2015
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Historical Challenges, Modern Solutions at Ballarat EastBy M Sykes
Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable
Jan 1, 2008
-
Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New ZealandBy W Newns
This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.
Mar 8, 2011
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Didipio Flash Flotation and Gravity Recovery CircuitBy M McGrory, A Rodolfo, J Paredes, L E. Manguba, K A Villaspir, G Webb, R Setiagani, H Cardenas
"OceanaGold’s Didipio operation has been in operation for three years. Integral to the flow sheet design is a flash flotation circuit treating a portion of cyclone underflow, consisting of an Outotec
Oct 10, 2016
-
Data Mining Mining Data - Ordered Vector Quantisation and Examples of its Application to MIne Geotechnical Data SetsBy B L. Dickson, E, M F. Lee, P A. Mikula
Computational techniques are needed to assist in the analysis and interpretation of the increasing amounts of geoscientific and mining related data and information that are routinely gathered at mine
Jan 1, 2006
-
Processing of Magnetite Iron Ores - Comparing Grinding OptionsBy A Jankovic, D David, P Payne
Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and
Jan 1, 2009
-
Planned Field Investigation of Connectivity between the Condamine Alluvium and Walloon Coal MeasuresBy S Gossmann, J Barlow, S Denner
"Unconventional gas resources, including coal seam gas (CSG) reservoirs, can be located above and below aquifers that provide groundwater for agricultural, industrial, urban and other uses. Developmen
Nov 26, 2013
-
Flotation of Unclassified Ball Mill Discharge for the Recovery of the Lead and Zinc ConcentratesThe sulphide ore occurring in the North Mine at Broken Hill is of a complex nature, consisting of an intimate mixture of argentiferous galena, marmatite (zinc-iron sulphide), and gangue minerals. A ty
Jan 1, 1933
-
Characterisation and Beneficiation of Low-Grade Indian Iron Ore FinesBy P K. Banerjee, S Kumar
Indian iron ores with less than 62 per cent Fe are currently unexploited, except for a few sectors which export them to foreign countries. It is anticipated that by 2012 the countryÆs domestic steel p
Jan 1, 2007
-
Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical MethodsBy A Garvie, D Kentwell, J Chapman
"Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi
Jul 10, 2012
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021