Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Perspectives on Future Global Collaboration for Mining Research and Education

    By M Scoble

    This paper addresses the importance of collaborative approaches to resolving future mining challenges. It attempts to provide some insight into understanding the theory, measurement, mapping and manag

    Nov 22, 2011

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming Conditions

    By Y Li, Z Fu, D J. Williams, E Topal

    Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface

    Jul 27, 2015

  • AUSIMM
    Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metal

    By Y Zhang, Z Zhao

    The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t

    Aug 21, 2024

  • AUSIMM
    Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project Value

    By P Myers, T Elkington, S Wonday

    Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S

    May 24, 2012

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    Comparison between ball mill and vertical stirred mill for the fine grinding of a low-grade iron ore

    By H Turrer, M Badawi, R Belissont, Y Foucaud, E Kleiderer, L Southavy, J Mesquita, Y Basselin

    The Mont Reed iron ore deposit, owned by ArcelorMittal, is situated approximately 140 km southwest of the Mont-Wright mine in the southern region of the Labrador Trough, Canada. Acquired by Québec Car

    Sep 18, 2023

  • AUSIMM
    Laboratory Flash Flotation Trends for a Variety of Gold Particles

    By T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen

    A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te

    Sep 26, 2013

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    New Blasting Initiation Technologies in the Mining Industry

    Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based

    Jan 1, 2005

  • AUSIMM
    Metallurgical Accounting in the Northparkes Concentrator - A Case Study

    By R Morrison, R Dunn

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    Porgera Flotation Circuit Upgrade and Expert System Installation

    By M Schaffer, T Kewe, N Moffatt

    Porgera mine is 95 per cent owned by Barrick Gold Corporation. It is located at an altitude of 2200–2700 m above sea level in the Enga province of Papua New Guinea and produces approximately 460 000 o

    Sep 1, 2014

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011