Search Documents

  • AUSIMM
    Why combine reverse circulation and diamond drilling in Mineral Resource estimation at Purnama?

    By A N. Kasnanto, D A. Sims, J Pocoe, B Pulungan

    In this case study we compare the sampling quality of diamond drilling (DD) and reverse circulation (RC) drilling at the high sulfidation Purnama gold–silver (Au-Ag) deposit located in northern Sumatr

    Sep 20, 2017

  • AIME
    Industrial Section (ea4b9199-a84f-4fc6-8bf2-35a05fd65fe7)

    For the use of those who prefer manila rope to wire rope for light hoisting and hauling, the Ingersoll-Rand Co. has brought out a new model Little Tugger Hoist which is designated No. 11. The square

    Jan 12, 1916

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • SME-ICGCM
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)

    By Alan A. Campoli

    The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • NIOSH
    IC 8283 Computing Reserves Of Mineral Deposits: Principles And Conventional Methods

    By Constantine C. Popoff

    This report reviews and analyzes, by a simple analytical and logical reasoning, the conventional methods of reserve computations of mineral deposits described in various domestic and foreign publicati

    Jan 1, 1966

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • SME
    Earthquake Engineering Of Tunnels - Revisited

    By G. Norman Owen, Roger E. Scholl

    INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh

    Jan 1, 1985

  • SME
    Freeport-McMoRan Finds New Way To Put Waste Oil To Use

    Equipment-washing facilities at Freeport-McMo-Ran?s Sierrita Mine in Arizona produce a mixture of oil and water that was difficult to dispose of easily or cheaply. However, after some changes in the f

    Jan 1, 2009

  • NIOSH
    OFR-7-95 Executive Summary Of The U.S. Bureau Of Mines Investigations In The Colville Mining District, Alaska ? Introduction

    By Mark P. Meyer

    During 1991 through 1993, the U.S. Bureau of Mines (Bureau) -Alaska Field Operations Center (AFOC) in cooperation with the Bureau of Land Management (BLM) -Arctic District Office and the State of Alas

    Jan 1, 2011

  • AIME
    Back Analysis of Slope Failures in the Cercado Uranium Mine (Brazil)

    By C. Dinis da Gama

    Because of the growing importance of back analysis for the interpretation of rock slope failures, particularly in open pit mines, it is suggested a methodologic sequence of activities for dealing with

    Jan 1, 1983

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • AUSIMM
    Iron Ore Fines to Slabs via the MIDREX« Direct Reduction Process in Western Australia

    By Pupazzoni P. D, Meissner D. C

    Incorporating an iron ore pelletising plant, a MIDREX'"' Direct Reduction Plant, and a mini mill, the conversion of iron ore fines to high- quality steel slabs in Western Australia is among

    Jan 1, 1999

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • AUSIMM
    Ore-Treatment Plant and Treatment Operations-Edna May Gold Mining Company N.L., Westonia, W.A.

    NATURE OF ORETHE Edna May ore consists mainly of clean quartz of a moderately hard and tough nature. The gold content is "free" and fairly coarse, so that a large percentage is recovered by

    Jan 1, 1919

  • NIOSH
    RI 7290 Metallization Of Iron Ores With Solid Reductants

    By M. M. Fine

    Research on the solid-fuel reduction of Knob Lake iron or was conducted to upgrade lean and high-grade ores and recover metallized products suitable for ironmaking or steelmaking. The program included

    Jan 1, 1969

  • ISEE
    The Assessment of Detonation Codes for Blast Engineering

    By C V. B Cunningham

    The assessment of blasting results under production conditions is extremely difficult. As a result, it can take months or years to establish objective and valid estimates of explosive performance in a

    Jan 1, 1991

  • SME
    Greenland: A Potential Trove of Minerals

    By Louis W. Cope

    Many Americans have seen Greenland while flying over it on their way to or from Europe. Few have visited this largest island in the world. Portions of the 20 percent of the territory that are not ic

    Jan 1, 2004

  • AUSIMM
    The Mineral Association of Tennant Creek Gold Ores

    By Edwards A. B

    The following note on the mineral association in the ores of the Tennant Creek Goldfield, Northern Territory, is largely based on Mineragraphic Reports Nos. 49, 89, 117 and 193 of the Council for Scie

    Jan 1, 1942

  • AUSIMM
    Opportunities for the Placer Gold Industry

    The placer gold industry has experienced a roller-coaster history incorporating four major boom eras. The first, 'hand-methods' boom arose in the mid-19th Century from application of an old

    Jan 1, 2003

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006