Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Increased Productivity through Frost Blasting

    By Terry Graf, Bill Thompson, John Guenther

    SYNCRUDE CANADA LTD.. operates the largest synthetic crude oil production facility in the world. Over 60,000,000 Bank Cubic Metres of oil sand is mined each year from their open pit located in Fort Mc

    Jan 1, 1993

  • ISEE
    Wall Control Blasting at the Manassas Quarry

    By J Lyall Workman, Peter N. Calder

    The Manassas Quarry is a large industrial stone quarry in Northern Virginia owned and operated by Vulcan Materials Company. The quarry experienced instability in a portion of the north wall, which inc

    Jan 1, 1992

  • ISEE
    The Evolution of Mining and Explosives in the Powder River Basin

    By Joseph W. Hejny, Marlyn G. King

    Coal mining in the Powder River Basin has changed in recent years to accommodate the large quantity of coal produced. With strip ratios of one to one and up to three to one, extensive amounts of overb

    Jan 1, 1994

  • ISEE
    Correlation Between Ground Vibration and Performances of Explosive (Ground Vibration by Underwater Explosion)

    By Minoru Kawamura, Koichi Kurokawa, Yukio Kato, Kenji Hashimoto

    It is well known that ground vibration by blasting is mainly related to a distance and charge weight. However, it is not known the correlation between ground vibration and performances of explosives;

    Jan 1, 1991

  • ISEE
    Single Round Blasting of 10 Food Diameter x 65 Foot Depth Emplacement Shaft Collars at the Mercury, Nevada Test Site

    By Tom Short, Bill Beam

    Some of the weapons testing shafts at Mercury, Nevada require depths of 1000ft and diameters of 10 feet. The top 40 feet to 65 feet is drilled, blasted and excavated by Large caisson type augers in or

    Jan 1, 1991

  • ISEE
    Underground Central Blast System Electric on Nonelectric

    By J R. "Dick" Daniel

    In the fall of 1988, The Cannon mine decided to investigate a central blasting system based on conventional electric blasting detonators being used to initiate rounds primed with Nonel detonators. The

    Jan 1, 1989

  • ISEE
    Development of the Wireless Initiating System Using Microwave Power

    By Masanobu Morita, Koichi Kurokana, Kenji Hashimoto, Yoji Tasaki, Yukio Iida

    "It has been the long desire of blasting engineer to realize the automatization of tunnelblasting to improve the safety and efficiency. As for bore hole drilling, the automatizationhas been achieved b

    Jan 1, 1993

  • ISEE
    Instrumenting Delay-Blast Malfunctions in Underground Coal

    By Michael S. Wieland

    This report discusses the U.S. Bureau of Mines research regarding the desensitization and malfunction of cap-sensitive explosives deployed in underground coal mines. Delay blasting in underground coal

    Jan 1, 1993

  • ISEE
    Reducing Vibration Damage Claims: Field Application of Strong Public Relations and One Method of Using Commonly Available Seismograph and Video Taping Equipment to Document Blast Vibration Regression at the Nearest Structure

    By Mark R. Fritzen, Ted A. Fritzen

    Anytime that blasting operations will be conducted near existing inhabited structures, vibration damage claims are a major concern of the blasting contractor. It has been our experience that even when

    Jan 1, 1994

  • ISEE
    Near-Field Vibration Monitoring

    By R Yang, P D. Katsabanis, W F. Bawden

    Understanding the mechanisms which are taking place during the propagation of a stress wave generated by an explosive charge is of high importance in the detection, characterization and prediction of

    Jan 1, 1993

  • ISEE
    Achieving Non-Duplicated Firing Times in Multipledeck Priming of Individual Blast Holes in Surface Coal Mining Using Non-Electric Down-the-Hole Primers and Electric Surface Initiation

    By James Ludwiczak

    We are coming to an end of an era in Midwest surface coal mining. For many years, large tracts of coal lands were readily available for sale or lease to surface mine operators.

    Jan 1, 1980

  • ISEE
    A Novel Initiating System for Blasting Explosives

    By R Fox, R Watt

    On behalf of ICI's group of explosives companies around the world, a research programme is being undertaken to develop a new electrical shotfiring system which will have markedly improved safety featu

    Jan 1, 1981

  • ISEE
    Oil & Gas Well Perforating the Other Explosive Industry

    By Richard Arsenault

    The production of oil & gas from wells requires method of flow from the producing formation into the well bore. Once the well is drilled it will have casing pipe installed to protect the integrity of

    Jan 1, 2007

  • ISEE
    The Measurement and Control of Blast Induced Damage of Final Pit Walls in Open Pit Mining

    By William R. Adamson, Carlos R. Scherpenisse

    The successful development of surface mining operations depends, amongst other factors, on the successful creation of final pit walls which offer long term structural stability. The achievement of suc

    Jan 1, 1998

  • ISEE
    Small Scale In-Rock Precompression Testing: Effects of Delay Timing

    By J J. Mullay, G W. Anderson, C J. McFinley, J F. VanNorman, C J. Kefer

    Previous work has shown that testing of precompression effects conducted on a small scale under simulated field conditions in actual rock provides a reasonable model for the evaluation of explosives a

    Jan 1, 1994

  • ISEE
    1 January 2003 : Deadline for meeting legal requirements relating to the sale of explosives in the European Union

    By R. K. Wharton

    A European Directive requires that an explosive which is sold or transported within Europe must meet certain essential safety requirements from 1 January 2003. The assessment and certification of such

    Jan 1, 2002

  • ISEE
    Demolition by Controlled Blasting of a Building in Cadiz (Spain)

    In this work, is being described the developing of the study for the demolition by controlled blasting project of a building of reinforced concrete, in the center of a spanish city. Synthetically, it

    Jan 1, 1977

  • ISEE
    A New Approach to Predict and Reduce Blast Vibrations by Modelling of Seismograms and Using a New Electronic Initiation System

    By R Ludeling, Klaus G. Hinzen, Ulrich Steiner, Friedrich Heinemeyer, Peter Roh

    A method for hybrid modelling of blast vibrations in time domain is developed. Field seismograms of single shot experiments are combined with computer simulations. In this way firing times of blasthol

    Jan 1, 1987

  • ISEE
    Non-Electric Sequential Blasting for Open Pit Mining Application

    By C A. "Hawk" Hanger

    "The paper that will be presented is an in-depth study of sequential blasting using standardnon-electric shock tube down hole timing along with surface M.S. connector timing.Included also will be a di

    Jan 1, 1993

  • ISEE
    The Application of GPS Positioning and Drill Monitoring Technology

    By Carl Hendricks

    AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of

    Jan 1, 2002