Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Rapid Load Testing In GermanyBy Marcel Bielefeld, Joost Bakker, Rob van Dorp
Pile load testing can be performed by a static, rapid or high strain dynamic (generally designated as dynamic) testing method. The static load test is often considered the “gold standard” of testing w
May 1, 2022
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Response of Pile and Pile Groups against Excavation Induced Ground MovementBy K Ilamparuthi, R. K. Madhumathi
"This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was
Jan 1, 2015
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger SuperstoreBy George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2005
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Application of Dry Jet Mixing to Earthquake DisasterBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) method as the representative deep mixing technique has been demonstrating best practice on ground mitigation works coping with complicated soil condition and limited site space.
Jan 1, 2015
-
Finned Piles Response Subjected To Lateral Loading In Clayey SoilsBy Viswanadham B. V. S., Babu K. V
Wind energy is one of the most economical renewable energy sources. In order to support wind turbines onshore or offshore open-ended monopile foundations are widely used. Unlike conventional structure
Sep 1, 2022
-
Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)By Chris L. Powell, Russell J. Denny
"The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165
Jan 1, 2017
-
Cockatoo Island Seawall Seepage BarrierBy Chris L. Powell, Russell J. Denny
"The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165
Jan 1, 2017
-
The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed TunnelBy J. S. Lee, R. K. Massarsch
"A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o
Jan 1, 2015
-
Predicting Geotechnical Drilled Shaft Capacity: Are We Close?By James G. Ulinski, Sebastian Lobo-Guerrero, Vishal B. Patel
"Recently modified design equations used in the transportation industry to calculate side friction and end bearing capacity for drilled shafts are now providing more realistic estimations of capacitie
Jan 1, 2017
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, CaliforniaBy Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure
Jan 1, 2015
-
Soil-Mix-Sandwich (SMS)By Ali S. Fayad
"In June 2014, Orange County Flood Control District (OCFCD) completed construction improvements of the East Garden Grove-Wintersburg Channel for a price of $42 million. Instead of the pre-existing tra
Jan 1, 2015
-
The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension PilesBy Qingwei Joshua Ong
Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd
Nov 1, 2022
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua