Application Study On Non-Destructive Static Test PileBy Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Innovative Riverbank Erosion Control Retaining Wall System for the Brazos RiverBy Tracy Brettmann, Will Bohlen
An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban
Jan 1, 2018
-
Allowable Compressive Design Stresses For Pressure-Treated Round Timber Foundation Piling - Presented Before The American Wood-Preservers' Association Reno, Nevada, May 1985By James S. Graham
Research at the University of Colorado on southern pine and Douglas-fir piling has determined that the existing building code design stress values of 1200 psi and 1250 psi, as determined by ASTM D-289
Jan 1, 1986
-
Underpinning With Steel Pipe PilesBy Pasi Korkeakoski
There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and
Jan 1, 2000
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
Quality Assurance In Jet Grouting For A Deep Seated Slab In AmsterdamBy Thomas Passlick
By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as
Jan 1, 2006
-
Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . SynopsisBy Lucien Weber
In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working
Jan 1, 1987
-
Creative Shoring Solutions For A Tight Urban SiteBy David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Seal Slab Prestressed Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
The Use of the Expander Body with Cast in Situ Piles in Sandy SoilsBy Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The ProblemBy M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole
Jan 1, 1992
-
Mitigating Settlement with Pile-Supported Approach SlabsBy Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Economical Piling In Soft Soils And Expansive ClaysBy D. Mohan
Soft to medium dense silty and clayey soils are found in many parts of India and conventional friction piles have normally been used for foundations of high rise buildings and other structures on such
Jan 1, 1989
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989