Pressure Injected Footings Mobile Convention Centre - IntroductionBy D. G. Bishop
This paper is intended as a review and update of the use of Pressure Injected Footings as deep foundation units in North America. We will discuss various aspects of this pile and then discuss a partic
Jan 1, 1992
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled ShaftsBy Josef K. Alter
Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr
Jan 1, 2011
-
Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson
Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc
Jan 1, 2009
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Base Grouted Piles - Mr. P. M Cashman, Independent ConsultantBy W. J. Kingwell
My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures
Jan 1, 1991
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance ProgramBy Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Drilled Shaft Foundations For The KcICON Missouri River BridgeBy Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
3 Recent Developments In Pile Design - Developments In Pile DesignBy W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? SynopsisBy S. X. Liang
In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput
Jan 1, 2010
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And StationsBy Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River TramwayBy Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002