    Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.

    By Sudhir Kumar Das

    "The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted

    Jan 1, 2015

  • DFI
    Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity Piles

    By W. G. K. Fleming

    Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m

    Jan 1, 1991

  • DFI
    Piled Rafts In Geotechnical Practice - An International Perspective

    By Michael W. Neill, O&apos

    The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures

    Jan 1, 2003

  • DFI
    Fogg Museum Expansion - Support of Excavation Design and Construction

    By James L. Christensen, Gregory Sanchez, Michael P. Walker

    The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat

    Jan 1, 2015

  • DFI
    Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast Loads

    By Michael Oakland

    This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Completely Automatized Recognition of the Installation Process in Special Foundation Construction

    By Christian Hoyme, Jochen Maurer, Hans Regler

    Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be

    Sep 8, 2021

  • DFI
    Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case History

    By Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet

    "Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat

    Jan 1, 2016

  • DFI
    Theoretical Ultimate Lateral Resistance near the Soil Surface in Unsaturated Cohesionless Soils

    By Oladayo O. Komolafe and Majid Ghayoomi

    p-y curves have been used over the years to determine the lateral resistance of piles. This method is popular among practicing engineers due to its simplicity and its ability to determine the slope,

    Sep 8, 2021

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore Foundations

    By Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck

    Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo

    Nov 1, 2022

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay Developments

    By Mikael Calando, Thomas Joussellin

    "San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa

    Jan 1, 2016

  • DFI
    Session 20 "Grouting for Water Retaining Embankments"

    By Timothy Flaherty

    We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe

    Feb 10, 2003

  • DFI
    UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology

    By Dario Libano, Armando Caputo, Francisco Caputo

    "UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent

    Jan 1, 2009

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    Building Drilled Shafts to Bridge the Mississippi

    By Brian Koch

    Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled

    Jan 1, 2019

  • DFI
    Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations

    By Tracy Brettmann

    The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b

    May 1, 2022