Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Feasibility of iron recovery from Mount Wright tailing material

    By John A. Meech

    "Oleic acid flotation of Mount Wright thickener underflow tailing material has been shown to be capable of increasing plant recovery by 3%. High levels of oleic acid addition (1.5 kg/t) are required,

    Jan 1, 1981

  • CIM
    A modified accumulator method for measuring surface radon flux from a uranium tailings pile

    By T. P. Lim, N. K. Davé

    "A modified accumulator method was devised to measure surface radon flux from porous media. It consists of a collector hood type of accumulator with a homogenizer pump and a pressure balancer. The lat

    Jan 1, 1982

  • CIM
    New techniques in blast monitoring and optimization

    By Norman J. Tienkaivip, Christopher J. Preston

    "This paper describes the use of electronics for physical measurement and computer analysis in both open-pit and underground mining operations for the ultimate purpose of optimizing production blasts.

    Jan 1, 1984

  • CIM
    Using hydraulic excavators to mine variably dipping coal seams

    By Ross G. Bertinshaw

    "The Line Creek Mine of Crows Nest Resources started mining coal in the fall of 1981. There are seven mineable seams with thicknesses ranging from 1.5 to 13 metres and with dips varying from 0 degrees

    Jan 1, 1985

  • CIM
    Simulation as a Tool to Enable World’s Best Mill Relining Practice (aafeded2-af45-4edf-b535-58771fc04187)

    By Peter Rubie

    "For many years, optimising the relining of hard rock grinding mills has been complicated by:?? the large number of variables;?? the low frequency of relines (slow feedback loop);?? the potential econ

    Jan 1, 2012

  • CIM
    Process Optimization for Boron Removal from Wastewater Using Co-Precipitation Process with Ettringite

    By Y. Tanaka, M. Maeda, S. Suzuki, C. Tokoro, T. Kato, K. Muto

    Boron (B) co-precipitation was investigated with ettringite to establish a cost efficient method of removing B from acid mine drainage. For 25 mg/L of B solution, most appropriate pH for B removal was

    Jan 1, 2015

  • CIM
    Gold analyses - myths, frauds and truths

    By G. W. Poling, G. W. Hawthorn

    """Unassayable gold and platinum group metals"" have come into vogue in the 70sand 80s in certain jurisdictions as a means of perpetrating fraud. Usual arguments are that a particular ore is not amena

    Jan 1, 1989

  • CIM
    An assessment of Soviet bucket-wheel excavator and direct sidecasting technology

    By F. G. Boehm, T. S. Golosinski, P. M. Tucker

    "In an earlier paper(1) the visits to several European mines using the bucket-wheel excavator (BWE) technology were described. It was during this trip that information was gathered on some interesting

    Jan 1, 1985

  • CIM
    Hydro-Fracturing Versus Hydro-Shearing: A Critical Assessment of two Distinct Reservoir Stimulation Mechanisms

    By V. S. Gischig, G. Preisig

    Hydraulic stimulation of deep reservoirs is an essential procedure for developing engineered/enhanced geothermal systems (EGS), but also in other Geo-energy contexts. The goal is enhancing permeabilit

    Jan 1, 2015

  • CIM
    Penasquito Project ?Achieving Success in Challenging Times

    CHALLENGES TO SCHEDULE/BUDGET Shortage of people (contractors, vendor support, engineering, staff) 2007 projects off the shelf Increase in metals prices Shortage of large tires Reserve increase

    May 1, 2010

  • CIM
    Feasibility Study and Optimization of Dissolution of Vanadium from Mining Residue via Biological Approach

    By H. Gharahbagheri, S. Shafiei Zadeh, H. Hassan Nejad, Reza Roostaazad

    In this paper, dissolution of vanadium from mining residue, in which vanadium is associated intimately with magnetite ore, was investigated via both bacterial ( aerobic and anaerobic) and fungal activ

    Jan 1, 2014

  • CIM
    La Mine Doyon mill expansion

    By G. H. Hope, A. R. Maycock

    "La Mine Doyon is a gold mining operation located in northwestern Quebec, approximately 35 km east of Rouyn-Noranda and 85 km west of Val d'Or. The mine is jointly owned by Lac Minerals Ltd. and

    Jan 1, 1988

  • CIM
    Performance improvement at the Bell Mine

    By M. C. Ethier, A. L. Laramie

    "The Granisle and Bell Copper mines were officially put into production in 1966 and 1972, respectively. The Granisle Mine was purchased in late 1979by Noranda and the two operations were amalgamated a

    Jan 1, 1990

  • CIM
    Field Relations, Origins, and Resource Implications for Platiniferous Molybdenum-Nickel Ores in Black Shales of South China

    By R. I. Grauch, Michael D. Glascock, Chen Nansheng, Jr Coveney, James B. Murowchick

    "Unusually rich molybdenum ores (cutoff grade = 4.10/0 Mo) hosted by Lower Cambrian black shales have been mined since 1985 near Zunyi in the province of Guizhou in China. Similar ores were once worke

    Jan 1, 1992

  • CIM
    Classification of ore reserves/resources based on geostatistical methods

    By P. Diehl, M. David

    "As shortage in the supply of mineral commodities become more probable, there is an increasing need for reliable and comparable reserve/resource data. It is therefore necessary to standardize the trad

    Jan 1, 1982

  • CIM
    Salt Deposits at McMurray, Alberta

    By J. A. Allan

    OCCURRENCES of salt in Alberta have been mentioned and described by the writer in 1929 (l) and by Cole in 1930 (2). Brine springs occur at a number of places along the valley of Athabaska river north

    Jan 1, 1937

  • CIM
    Investigation of Cu Coated Ni as Potential Current Collector for Solid Oxide Fuel Cells Fed by Syngas Containing H2S

    By Qing-Xun Low

    Ni current collector has excellent electronic conductivity and mechanica, properties. However, nicke, cannot be used in H2S-containing syngas SOFCs due to sulfur poisoning and coking. Copper coated ni

    Jan 1, 2010

  • CIM
    On The Use of Copper Concentrates Blended With Complex Gold Concentrate for Gold Recovery Using the SKS Smelting Process

    By Yan Jie

    A series of production technologies are described for gold recovery from complex gold concentrate blended with copper concentrate treated in the SKS smelting process comprising: 1) Feed preparation an

    Jan 1, 2019

  • CIM
    Study on Feasibility of Columnar Jointed Basalt as a High-Arch Dam Foundation

    By Wei Yun-Jie

    Columnar jointed basalt is a fractured rock, with a lot of small spacing structural planes and poor integrity of the rock mass. On the basis of the comprehensive study of the columnar shape of Columna

    May 1, 2009

  • CIM
    Use of Placer Gold Characteristics to Locate Bedrock Gold Mineralization

    By Jeffrey S. Loen

    "Abstract - The size, morphology, surface texture, per cent mineral inclusions, and bulk chemistry (Ag and trace elements) of placer gold particles vary systematically according to transport distance

    Jan 1, 1995