Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003
-
Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill ControlBy Murray Wood, Michael Schaffer, Makat Katom
"An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin
Jan 1, 2003
-
An Overview of Corporate Social Responsibility in the Canadian Mining IndustryBy Dara L. Hrytzak-Lieffers
Canada has long since been a place that has led the world in mining development, in a safe, clean, and sustainable manner. This has led to the integration of corporate social responsibility (CSR) phil
May 1, 2011
-
Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)By P. H. Oliver
"The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del
Jan 1, 2003
-
Changes to drill pattern and adequate inter-row delay time improve blasting performanceBy P. H. Oliver
The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela
May 1, 2003
-
Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and AutomationBy Christoph Miller
About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M
Oct 1, 2009
-
Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet"Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu
Jan 1, 1992
-
An Approach to Energy Management at Falconbridge Nickel Mines LimitedBy D. M. Doyle
"A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc. over progressively shorter time peri
Jan 1, 1979
-
"Dacum" at the Carol ProjectBy G. Taylor
"The Iron Ore Company Of Canada's Carol Project is located in Labrador City, Newfoundland. Labrador City is some 912 air kilometers northeast of Montreal, and 417 ratl kilometers north of Sept-Iles, Q
Jan 1, 1982
-
Production Simulation Overview and Case Study: Coleman 170 OrebodyBy Scott Hopkins
Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is
May 1, 2008
-
ILTEC Technology – New Pathways towards Safe and Effective CoolingBy T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert
It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te
Jan 1, 2019
-
Potash Processing, an Overview with Particular Reference to the Cominco PlantBy A. F. Banks
"Potash processing has much in common in terms of unit operations and plant operating strategy with other mineral processing plants. As it is a rather large topic the processes will be broad brushed t
Jan 1, 1976
-
Mine Reclamation in a Changing Regulatory EnvironmentBy David H. Searle
This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well
May 1, 2006
-
Biological Alkalinity Generation in Acid Mine DrainageBy M. Kalin
"Ecological Engineering and Biological Polishing technology is a decommissioning approach for inactive coal, uranium and base metal operations. To improve acid mine drainage water some fundamental asp
Jan 1, 1991
-
Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)By T. G. Joseph
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
Nov 1, 2011
-
Economics and Perspectives of Underground Backfill Practices in Canadian MinesBy E. De Souza
Two comprehensive surveys, which focus upon backfill practices and the economics of backfilling in underground mines in Canada, have been conducted. The two surveys were designed to assess operational
May 1, 2003
-
Ultrasound Use in Copper-Nickel Sulphide FlotationBy Yum Xiaoquan, Turgut Yalcin
"A laboratory study was carried out to determine the potential role and effect of ultrasonic irradiation in the flotation of a Sudbury copper-nickel sulphide ore. The use of ultrasound was tested sepa
Jan 1, 2005
-
A Method to Assess Size Reduction by GrindingBy Daniel Hodouin, Claude Bazin
"A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t
Jan 1, 2004
-
Frozen Lump Generation of Oil Sands ? Climatic Challenges and SolutionsBy Derek J. Cyr
Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.
May 1, 2004
-
General Discussion - Impurity Penalties in Smelter ContractsBy G. C. McKerrow
"Mr. G.C. McKerrow, Assistant Manager of Noranda Mines and formerly Smelter Superintendent attended the meeting to answer questions as to why smelters imposed penalties for too much zinc in a copper c
Jan 1, 1971