    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • AUSIMM
    Relationships Between Geological Resolution and Flight Line Spacing in Low Level Aeromagnetic Surveys

    By Spencer GA, Saul SJ

    The flight line spacing in low level aeromagnetic surveys is the principal factor governing both the cost and the amount of geological detail which can be extracted from the data. The rate at which ge

    Jan 1, 1976

  • AUSIMM
    Investigations into the Removal of Airborne Pollutants From Underground Ventilating Air in a Deep Hot Mine

    By T J. Sheer

    The removal of airborne pollutants from underground ventilating air is discussed. The work concentrates on the removal of CO, CO2, NOx, SO2, radon gas and respirable carbon particles. The investigatio

    Jan 1, 2005

  • AUSIMM
    Open Pit Design in the 90Æs

    By Rozman L. I

    This paper describes the latest open pit optimisation techniques,which now go beyond merely finding an optimal outline. The paper starts by briefly reviewing pit design techniques before optimsation

    Jan 1, 1991

  • AUSIMM
    Estimation Of Gold Ore Reserves At Mt. Charlotte, Kalgoorle, Western Australia

    Gold occurs at Mt. Charlotte associated with a stockwork of pyritised quartz veins in Unit 8 of the Golden Mile Dolerite. The ore- body is massive, 200m long and 40m wide and has been proved to over

    Jan 1, 1979

  • AUSIMM
    Combining Modern Assessment Methods to Improve Understanding of Longwall Geomechanics

    By Hatherly P, Luo X, Balusu R, Gale W

    Ongoing, collaborative research between CSIRO's Exploration and Mining and Strata Control Technology has resulted in a better understanding of rock failure mechanisms around longwall extraction.

    Jan 1, 1998

  • AUSIMM
    Development and Application of the SHOTPlan TM Blast Sequence Design Software

    By Evans R, McCallum P

    Modem blast initiation systems allow users many options for connection and application in the field, and have resulted in more innovative and complex uses of sequencing to influence blast outcomes.

    Jan 1, 1995

  • AUSIMM
    Borescope Techniques for Assisting Colliery Roof Control

    By Rixon LK, Walton KP

    Evidence will be presented to show that borescope inspection of mine roofs is one of the most useful techniques available for stability assessments. ACIRL currently has four borescopes, comprising

    Jan 1, 1986

  • AUSIMM
    The Development of Very Large Screens for the Preparation of Coal and Mineral Raw Materials

    The paper describes the reasons for the development and for the selection of systems which were finally adopted; further estima- tion and design engineering problems, as well as experience with lar

    Jan 1, 1984

  • AUSIMM
    Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New Zealand.

    By Sibson RH

    The gold province of Otago occupies an area of upwarped basement, the Otago Schist, comprising predominantly quartzofeldspathic and volcanogenic metasediments. This assemblage is the product of colli

    Jan 1, 1995

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    The Early Carboniferous Glenrock Group, Burdekin Basin, North Queensland: Basic To Acid Continental Volcanism and Epiclastic Facies of a Continental Margin Magmatic Arc

    By Lockhart D. A, Gleeson P, Lang S. C

    The Glenrock Group forms the uppermost part of the Early Devonian to Early Carboniferous Burdekin Basin sequence in the Townsville hinterland, north Queensland. As redefined, three formations make up

    Jan 1, 1990

  • AUSIMM
    Particulate Fluids - A Key Concept in Advanced Mineral Processing

    The mineral pulp as it passes through grinding-classification, flotation and solid-liquid separation is examined in the context of it being a particulate fluid. By focussing on the complex viscosity

    Jan 1, 1993

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Oxidation of Zinc Sulfide in a Fluidised Bed of Very Low Oxygen Concentration

    By Miyatani J. Asaki Z, Kondo Y

    The oxidation of sphalerite particles of 60 to 100 mesh size was studied in a fluidized bed of low 02 concentration at 900¦C. Par- tial pressure of 02 in the fluidizing 02-N2 gas mixture was chosen

    Jan 1, 1980

  • AUSIMM
    Rehabilitation, Recommissioning and Upgrading of the Leinster Nickel Concentrator

    By Millett R

    In January 1989, Western Mining Corporation (WMC) acquired the Perseverance and Rocky's Reward orebodies and associated infrastructure from the Agnew Mining Company (AMC). AMC had closed the o

    Jan 1, 1991

  • AUSIMM
    Some Petrographic and Genetic Aspects of Rampura - Agucha Zinc - Lead Deposit, District Bhilwara, Rajasthan, India.

    By Singh TN

    Rampura-Agucha Zinc-Lead deposit is unique as it is reported for the first time in the gneissic terrain with a rich oregrade quality of early to middle Proterozoic of Bhilwara supracrustal belt in the

    Jan 1, 1990

  • AUSIMM
    Reformation of the Hydraulic Stowing Mining Method

    By Bingwen Z, Fengyi K

    The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover- caving and artificial mining method and the fully mechanized sublevel-caving mi

    Jan 1, 1992

  • AUSIMM
    The Nickel Industry - A WMC Perspective

    By Hall S, Upton D

    WMC Resources Ltd nickel operations have expanded significantly over the last three years. Production capacity has increased at mine/concentrate, smelting and refinery processes to such an extent th

    Jan 1, 1996

  • AUSIMM
    Power Supply for Resource Projects (8ecc30a6-60bd-418c-872d-5915924f6785)

    The provision of electrical power is an important consideration in project development. The first step to be taken in this area is to assess the power requirements of the project. The alternatives of