Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Porgera Gold Deposit, Papua New Guinea: The Influence of Structure and Tectonic Setting on Hydrothermal Fluid Flow and Mineralisation at a Convergent Plate Margin (16186b1d-6c25-4af8-9364-e7daeb6b3e56)

    The structure and tectonic setting has had a strong influence on gold mineralisation at the Porgera gold deposit. Here, the structural controls on the mineralisation at Porgera are discussed and plac

    Jan 1, 1995

  • AUSIMM
    The Reduction Of Iron Ore Pellet Beds With Gaseous Reductants

    The laboratory-scale reduction of fixed beds of iron ore pellets has been investigated over a range of experimental conditions. The effects of reduction temperatures, gas compos- itions and flowrate

    Jan 1, 1974

  • AUSIMM
    The Effect of Nickel on Fire Assaying Processes for the Determination of Silver

    A study of the effect of nickel on the cupellation process has shown that a very low "nickel limit" must be imposed for cupellation (0·08 grams nickel or 0·05 grams when copper is

    Jan 1, 1960

  • AUSIMM
    The Investigation of Atmospheric Dusts at North Broken Hill Limited

    For many years the mining industry at Broken Hill, New South Wales, Australia, was carried on with just sufficient attention to underground ventilation and hygiene conditions as to keep pace with nece

    Jan 1, 1940

  • AUSIMM
    Significance of in Situ Strength Measurements for Prediction of Outburst Hazard in coal Mines of Lower Silesia

    Lower Silesia Coal Basin/SW Poland/ is adjacent to highly gas saturated igneous massiv and since the beginning of this century more than 1500 outbursts have occurred in four existing mines, includi

    Jan 1, 1980

  • AUSIMM
    The Geology of Manganese Occurrence in Western Australia

    Manganese ore has been mined from the Peak Hill Gold- field since 1948 and from the Pi'lbaraòGoldfield since 1954, and it is probable that some deposits- In and, near the Phillips River Goldfie

    Jan 1, 1964

  • AUSIMM
    Concentrate Handling Plant of the Broken Hill Associated Smelters Pty. Ltd. At Port Pirie

    By Peck WH

    For many years it was realised that the methods used for unloading concentrates at Port Pirie were inefficient and labour intensive, therefore, when a decision was reached to standardise the east-w

    Jan 1, 1975

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    A Mineralogical Procedure for Recognising Cyanicides in Gold Processing

    I In an optical microscope, mild attack by cyanide solutions on various minerals can be observed by means of colour changes as well as etching patterns. However, the mineral may not be identifiable

    Jan 1, 1991

  • AUSIMM
    The Sydney Harbour Colliery, Balmain

    By Bahsford A

    The presence of coal in the Sydney area was confirmed in 1891 when Cremorne Bore No. I intersected cindered coal at 1 854 m. The decision to develop Sydney Harbour Colliery was based on the results

    Jan 1, 1988

  • AUSIMM
    Dartbrook Mine - A Case Study

    Any project carries a number of challenges and risks. Inappropriate design, poor project management, time, industrial disputation and capital over runs are all areas which can impact on a project cash

    Jan 1, 1998

  • AUSIMM
    Application of a Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model for Subsidence Prediction

    By Chugh Y. P

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the

    Jan 1, 1992

  • AUSIMM
    The Influence of Rock Mass Quality in Controlled Blasting

    The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dynamic forces to which the excavation can be subjected and sustain damage. Though each speci

    Jan 1, 2003

  • AUSIMM
    Some Aspects of the Design of Saraji Mine

    Commencing early in 1975, Saraji Mine in Central Queensland will product 3.56 million tonnes in the first year and then 4.57 million tonnes annually for the Japanese and European markets. The coal

    Jan 1, 1974

  • AUSIMM
    Optimisation of Overburden Blasting Mount Thorley Colliery

    By Mckenzie CK, Scott A

    The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut

    Jan 1, 1987

  • AUSIMM
    Rogers Pass Tunnel - Bore and Blast

    By Hansmire WH

    The 14.7 km Mt. MacDonald Tunnel beneath Rogers Pass in Canada used both drill-and-blast and machine boring methods. A unique ventilation system provides for diesel operations. The design featured

    Jan 1, 1987

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Aspects Of Stimulating Iron Ore Induration

    By Clark K. N

    The need for and advantages of simulators in iron ore pellet induration research are described. The approaches to simulation and the techniques to carry it out are discussed in detail covering dryi

    Jan 1, 1974

  • AUSIMM
    A Case Study of the Development, Engineering and Construction of a Biological Oxidation Plant for a Refractory Pyrite-Arsenopyrite Gold Ore

    By M Binks

    This paper presents a case study that describes the selection, development, engineering and construction of a process plant for the biological oxidative pre-treatment of a refractory pyrite-arsenopyri

    Jan 1, 2004

  • AUSIMM
    The Bucket Wheel Excavator at Goonyella-A Case Study

    Utah's Blackwater mine began operations in 1967. The four CQCA mines controlled by Utah followed over the period 1971 to 1979. Project feasibility studies for all these were based on open cut

    Jan 1, 1983