Search Documents

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • CIM
    Decision-Making Using an Integrated Evaluation Model Versus Sensitivity Analysis and Monte Carlo Simulation

    By Grant D. Nicholas

    This paper compares an integrated evaluation approach to decision-making with more traditional sensitivity analysis and Monte Carlo simulation. The primary objective is to highlight the differences in

    May 1, 2007

  • ABM
    Caracterização Tecnológica De Escórias De Aciaria

    By Blênio Márcio Cunha Silva

    A indústria siderúrgica global está buscando cada vez mais tecnologias para tornar o seu processo produtivo mais sustentável e competitivo. Uma das grandes oportunidades, já conhecida nesse setor, é

    Aug 17, 2017

  • ABM
    Influência Da Adição De Nanotubos De Carbono Nas Propriedades Mecânicas Da Liga Al-2%ni Solidificada Unidirecionalmente

    By Luiz Gabriel da Silva Nascimento

    Foi fabricada uma matriz hipoeutética de Al-2%Ni e adicionado nela concentrações de 0,5; 1,0; e 1,5 % de nanotubos de carbono de paredes múltiplas (NTCPM). A fabricação do material estudado aconteceu

    Aug 17, 2017

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • ABM
    Ações De Controle Para Evitar O Rompimento De Pele Nas Máquinas De Lingotamento Contínuo Da Aciaria 2 Da Usiminas, Usina De Ipatinga

    By Alexandre de Freitas Gomes de Mendonça

    São crescentes as exigências por confiabilidade nos processos siderúrgicos. Nesse contexto, a Usiminas tem direcionado esforços em suas aciarias na busca da melhoria contínua dos processos garantindo

    Aug 17, 2017

  • SME
    Effect Of Structural Changes On Grindability Of Some Boron Minerals

    By S. Sener

    In this investigation, the changes in the grindability of both ulexite and colemanite related with the different structural modifications created by the heat treatment were examined with respect to wo

    Jan 1, 1999

  • SME
    New Soda Ash Technology Plant Highly Successful

    By T. Dunn

    FMC Corporation has achieved a significant cost reduction through a new proprietary solution mining and processing technology at its Green River, Wyoming Soda Ash Facility. In the first phase, complet

    Jan 1, 1998

  • CIM
    Monitoring Insights from a Ventilation on Demand Collaborative Research Initiative

    By Stephen Hardcastle

    Presentation Outline ? Introduction ? Mine Ventilation Facts ? Ventilation-on-demand (VOD) ? Sensors/Controls ? Continuing Work ? Conclusions ? Mine ventilation engineering practices were publ

    Nov 1, 2011

  • DFI
    Laboratory Mixing and Testing for Controlled Waste Disposal Site

    By Tomohiro Yamasaki

    "At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand

    Jan 1, 2015

  • CIM
    The Platinum-Group Minerals

    "7.1. Glossary of the Platinum-Group Minerals7.1.1. IntroductionA glossary of the platinum-group minerals (POM) serves as a useful introduction to a chapter on their mineralogy. Earlier glossaries (Ca

    Jan 1, 1979

  • NIOSH
    RI 3900 Exploration of the Magnet Cove Rutile Co. Property, Magnet Cove Area. Hot Spring County. Ark.

    By Robert V. Spencer

    "This report describes an examination and preliminary exploration of the Magnet Cove Rutile Co. property in Hot Spring County, Ark. The company in 1944 was producing titania for use in-the welding-rod

    Sep 1, 1946

  • RMCMI
    In Loving Remembrance (698b8ca6-dc7c-42b1-98fc-8ce503a4f240)

    of our good friends and fellow members: W. S. Worthington H. W. Bullock who left the world better for their having lived in it.

    Jan 1, 1932

  • ABM
    Microestrutura E Resistência À Corrosão De Junta Soldada De Inconel 625

    By Leandro Brunholi Ramos

    As superligas de níquel apresentam boa combinação de resistência à corrosão e à oxidação, resistência mecânica, resistência à fadiga e à fluência, além de conseguirem operar em temperaturas elevadas,

    Aug 17, 2017

  • ABM
    Ovalização De Bobinas A Quente De Aços Com Médio Teor De Carbono

    By Antonio Augusto Gorni

    O posicionamento de bobinas a quente com seu eixo na direção horizontal protege suas bordas, mas restringe sua área de apoio sobre o solo. Logo, é inevitável que a bobina sofra algum grau de ovalizaçã

    Jul 30, 2018

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • AIME
  • CIM
    Effective production monitoring in open pit mines: Beyond the technology

    By P. L. Richard

    An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren

    May 1, 2004

  • CIM
    Effective production monitoring in open pit mines: Beyond the technology

    By P. L. Richard

    An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren

    Jan 1, 2004

  • CIM
    Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element Models

    By D. A. Beck

    The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t

    May 1, 2009