Search Documents

  • SAIMM
    Determination of in situdeformation modulus for cemented rockfill

    By D. R. Tesarik, F. M. Jones, J. B. Seymour

    As part of safety and stability studies at three underground mines in the United States, researchers installed earth pressure cells and embedment strain gauges in cemented rockfill to measure stress a

    Jan 1, 2003

  • SAIMM
    Development of a fuzzy model to estimate engineering rock mass properties

    By S. Jeon, J. Kim, H. Lee

    Though the importance of the engineering rock mass properties such as deformation modulus, cohesion and friction angle is emphasized, the researches on the reliability of these values are rarely perfo

    Jan 1, 2003

  • IMPC
    The Control of Calcium and Magnesium in a Base Metal Sulphate Leach Solution (60a7c70a-da9d-47c5-9e97-61f048b895cb)

    By M. Pelser, C Aldrich

    "The presence of calcium and magnesium in the hydrometallurgical processing of base metals, results in a number of process difficulties. These problems range from the contamination of the final produc

    Jan 1, 2003

  • TMS
    Is Extractive Metallurgy Becoming Extinct?

    By Ian M. Ritchie

    Right across the universities of the developed world, the traditional disciplines of physics and chemistry are losing ground. Extractive metallurgy, which depends so heavily on chemistry, is also con

    Jan 1, 2003

  • AUSIMM
    New Regional Geological Mapping and Other Data for Mineral Exploration in New Zealand

    Geological maps, data, and prospectivity analysis relevant to mineral exploration in New Zealand have recently been released. Regional-scale geological mapping is increasingly available for the countr

    Jan 1, 2003

  • SAIMM
    Annual Report - For The Year Ended 30th June, 2003

    Council for 2002/2003 President S.J. Ramokgopa President-elect T.R. Stacey Vice-presidents Senior F.M.G. Egerton Junior W.H. van Niekerk Immediate Past-president A.A.B. Dougla

    Jan 1, 2003

  • AUSIMM
    Influence of Iron Bearing Carbonates and Reactive Iron Sulfides on Acid Rock Drainage Static Predictive Testwork

    By J Thoma, W Skinner, W Stewart, R Smart

    The acid neutralisation capacity (ANC) of rock sample containing significant iron carbonates and/or reactive framboidal pyrite can be a difficult parameter to determine. Results indicated that negativ

    Jan 1, 2003

  • AUSIMM
    The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator

    By D R. Carr

    The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity

    Jan 1, 2003

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • AUSIMM
    The Great Artesian Basin ù Use and Sustainability

    By L M. Foster, J R. Kellett, G A. McMah

    The Great Artesian Basin (GAB) contains one of the largest reserves of fresh water in the world. The volume in storage is enormous, being estimated at nearly 65 000 million megalitres (ML). Developmen

    Jan 1, 2003

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • TMS
    Zirconia-Based Inert Anodes For Green Synthesis Of Metals And Alloys (Invited)

    By C. P. Manning

    This paper reports recent progress in the development of a unique metal extraction technology utilizing zirconia-based inert anodes for the electrolytic reduction of metals from their oxides. In this

    Jan 1, 2003

  • SAIMM
    Predicting Coal Pillar Life In South Africa

    By J. N. Van der Merwe

    The data base of failed coal pillars in South Africa was analysed with regard to the time of failure in an effort to develop a method to predict how long after their formation coal pillars will fail.

    Jan 1, 2003

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • TMS
    Mathematical Modeling Of Phase Interaction Taking Place During Fusion Welding . Processes (Invited)

    By Michael Zinigrad

    The quality of metallic materials depends on their composition and structure and these are determined by various physico-chemical and technological factors. To effectively prepare materials with requi

    Jan 1, 2003

  • SAIMM
    Rope and mechanical testing to improve safety

    By A. Peake

    Background The CSIR Division of Mining Technology assumed responsibility for the operations of the Hoist Rope and Mechanical Test Laboratories at Cottesloe in April 1999. The laboratories were pr

    Jan 1, 2003

  • SME
    Conveyor Pulley Specifications For Aggregates

    By D. Keech

    The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 “Welded Steel Conveyor Pulleys” adequately defines standard pulleys for most aggregate material handling applications. How

    Jan 1, 2003

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003

  • SAIMM
    Tailings based pipe-support systems

    By C. E. Hales

    In an effort to improve efficiencies and reduce costs, AngloGold has embarked on a process to develop and deliver consistent, high quality, tailings based support or construction products to stopes an

    Jan 1, 2003

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2003