Search Documents

  • AUSIMM
    Determining the Impacts of Salinity on Freshwater Organisms

    By R Mann, R Prasad, S Vink, V Nanjappa

    The level of salinity that various aquatic organisms can tolerate without incurring any adverse effects is dependent on several environmental and evolutionary factors. These factors include the relati

    Nov 26, 2013

  • CIM
    Determining the In Situ Stress with Thermally Induced Borehole Breakout

    By E. Heikkinen, J. Suikkanen, T. Siren, J. Valli, M. Hakala

    Diametrically faced borehole breakout observations are a fairly good indication of magnitude of the secondary stresses acting perpendicular to the borehole. In cases of low in situ stresses, where bor

    Jan 1, 2015

  • SAIMM
    Determining the ions with the most impact on froth stability in Cu-Ni-PGM ore flotation, M.S. Manono and K.C. Corin

    By K. C. Corin, M. S. Manono

    The mining and mineral concentration of Cu-Ni-PGM sulfide ores in South Africa occurs in semiarid regions. The scarcity and availability of water resources in these regions has become one of the bigge

    Jan 1, 2020

  • CIM
    Determining the Mechanical Properties of Igneous Rocks in the Western Limb of South Africa’s Bushveld Complex

    By J. D. Bosman, L. J. Gardner

    "The Bushveld Complex is a large layered igneous intrusion, located in the northern parts of the Republic of South Africa. The complex hosts the largest known reserves of Platinum Group Metals in the

    Jan 1, 2015

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Determining the oil sands mining limit with Lerchs-Grossmann optimization

    By L. Chunpongtong

    The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema

    Jan 1, 2014

  • AIME
    Determining The Operating Point For A Mine Fan Installation - A Comprehensive Method

    By J. M. Mutmansky, Y. J. Wang, H. L. Hartman

    Procedures for determining the operating point that results when a fan is connected to a mine and placed in operation have been a source of confusion for decades. A variety of techniques have been pro

    Jan 1, 1986

  • SME
    Determining the optimum number of entries for longwall development panels in deep, gassy mines

    By R. E. Ray

    As coal reserves at shallow depths continue to be exhausted, a number of US coal companies are developing seams previously considered too deep to mine economically. Because of increased cover load, mi

    Jan 1, 1988

  • SME
    Determining The Optimum Number Of Entries For Longwall Development Panels In Deep, Gassy Mines (PRIPRINT 86-87)

    By R. E. Ray

    As coal reserves at shallow depths continue to be exhausted, a number of U.S. coal mining companies are beginning to develop coal seams previously thought to be coo deep to mine economically. Because

    Jan 1, 1986

  • AUSIMM
    Determining the Pressure Pulse for an Air Blast

    By M A. Tuck

    Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo

    Jul 1, 2013

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • NIOSH
    Determining The Root Causes Of Flame Cutting And Welding Fires In Underground U.S. Coal Mines

    By Jürgen F. Brune, Alex C. Smith, William D. Monaghan

    One of the predominant causes of fires in underground coal mines is flame cutting and welding. These fires can lead to major events such as the explosion that occurred on January 22, 2003 in an airsh

  • NIOSH
    Determining the Spatial Variability of Personal Sampler Inlet Locations

    By Robert Vinson

    This article examines the spatial variability of dust concentrations within a coal miner?s breathing zone and the impact of sampling location at the cap lamp, nose, and lapel. Tests were conducted in

    Jan 1, 2007

  • SAIMM
    Determining the value of additional drilling

    The spatial distribution of copper grades at the Mansa Mina project is highly variable due to the presence of high grade copper/silver/arsenic breccia bodies. Copper grades within the breccia bodies t

    Jan 1, 2003

  • SME
    Determining Value-Added Opportunities in Industrial Minerals

    By Steven B. Van Kouteren

    Value added is a loosely used qualifier in the industrial minerals industry. What exactly does it mean? What does it take to make a value-added product? More importantly, how does a company maintain t

    Jan 1, 1990

  • AIME
    Determining Ventilation Requirements For Continuous Miners

    By Howard L. Hartman

    There is reason to believe that ventilation systems so far devised for use with continuous mining machines fall far short of success. This is vividly demonstrated to anyone who has observed in a conti

    Jan 3, 1962

  • AUSIMM
    Determining ventilation system model inputs from field test work in the oil shale mine

    By S Sabanov

    Determining ventilation system model inputs from the field test work has been produced in the working oil shale mine which has been in production since the early 1970s. At this mine room-and-pillar wi

    Aug 28, 2017

  • SME
    Determining Work Indices From SMB Standard Tests

    By S. C. O?Brien

    This paper develops the procedure for simulating the special locked-cycle Work Index laboratory test using the kinetic parameters obtained by conducting standard size-mass balance (SMB) grinding tests

    Jan 1, 1987

  • DFI
    Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in Bangladesh

    By Arpit Parikh

    "Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro

    Jan 1, 2017

  • SME
    Deterministic And Stochastic Water Balance Modeling Of The Gilt Edge Mine Superfund Site, South Dakota

    By K. Wangerud, B. S. Caruso

    A water balance model with deterministic and stochastic components was developed and used for the Gilt Edge Mine Superfund Site, South Dakota, to evaluate risks of contaminated runoff discharging to s

    Jan 1, 2002