Search Documents

  • CIM
    Design and Commissioning of Commercial Coal Preheating Plants

    By R. H. Chambers, L. Alderman

    "The paper is introduced by an examination of the factors which have led to the present world-wide interest in charging preheated coal to coke ovens. Various possible methods of preheating and chargin

    Jan 1, 1972

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • SME
    Design And Construction Challenges At The Gualcamayo Mine

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese

    Jan 1, 2011

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • SME
    Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024

    By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor

    The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage

    Jun 23, 2024

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

    By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck

    Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti

    Dec 1, 2022

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • DFI
    Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation

    By Ken Andromalos

    Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili

    Jan 1, 2007

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • SME
    Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland

    By Keith Jones, Martin Knights, Timothy Watson

    In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a

    Jan 1, 2003

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By F. Djahanguiri

    The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv

    Jan 1, 1995

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • SME
    Design and Construction of a Deep Underground Station in Urban Area - RETC2021

    By Verya Nasri

    This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i

    Jun 13, 2021