Search Documents

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Construction Of The Pacheco Pumping Chamber And Shafts

    By Russell Clough

    The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re

    Jan 1, 1985

  • SME
    Construction of the Pergau Hydroelectric Power Project, Malaysia

    By Patrick J. Doig

    In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,

    Jan 1, 2001

  • SME
    Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021

    By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli

    The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a

    Jun 13, 2021

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • SME
    Construction Of The South Interceptor Montreal, Quebec, Canada

    By Jacques Mongrain, Serge Barbeau, Gary Brierley

    The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels

    Jan 1, 1987

  • SME
    Construction of the SR-99 recovery shaft

    By Lance Rasband, Richard Hanke, John Starcevich

    "Mining on Seattle’s SR99 tunnel began in July of 2013. Initial mining progressed slowly through a 4.5 m (14.9-ft) thick fiber-reinforced concrete headwall before immediately entering the first of thr

    Jun 1, 2016

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

    By L. L. Lacerda, A. J. Blair

    The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double

    Jan 1, 2005

  • DFI
    Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, California

    By Eric S. Lindquist

    Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap

    Jan 1, 2010

  • SME
    Construction Phase Services for Australian and North American SEM Tunneling - NAT2024

    By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim

    Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s

    Jun 23, 2024

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • SME
    Construction Progress of the Ottawa LRT Line - From Early Design Stages to Current Construction Milestones

    By Franz Wilhelmstoetter, Christian Karner

    "The Confederation Line is phase one of Ottawa’s light rail transit, which consists of 13 stops and stations. The project’s center piece is a 2.5 kilometer (1.6 miles) long tunnel with three undergrou

    Jan 1, 2016

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • SME
    Construction Uses - Gypsum Plasters And Wallboards

    By Harlan L. Kebel

    Gypsum, the dihydrate form of calcium sulfate, has a history of usefulness to man dating back several thousand years, and a worldwide industry has been built on the mining and processing of this versa

    Jan 1, 1994

  • SME
    Construction Uses - Lightweight Aggregates

    By Bruce H. Mason

    Lightweight aggregates are classified as those minerals, natural rock materials, rock-like products, and byproducts of manufacturing processes that are used as bulk fillers in lightweight structural c

    Jan 1, 1994