Search Documents

  • AUSIMM
    Capacity Increase of the World's Strongest Belt Conveyor - Pushing the Limits in Chilean Copper Ore by RWE

    Mining of copper ore is still the most important business in Chile. In order to mine ore with a copper content of less than one percent at Minera Los Pelambres in an economical way, opencast mining is

    May 1, 2010

  • IMPC
    Capacity of an Acid-activated Somas Bentonite in the Bleaching of Soybean Oil

    By S. Sarioglan

    The bleaching of edible oils, industrial oils, and some chemicals may be achieved using natural and acid-activated clays. These materials remove impurities and pigments from the oils. In this work, a

    Jan 1, 2014

  • DFI
    Capacity Of Driven Piles In Sand

    By Mohab Sabry

    Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th

    Jan 1, 2006

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • ABM
    Capacity Planning For Manufacturing And Logistics Based On Simulation Technology

    By Fábio Heiji Yamada, Marcelo Koiti Fugihara, Ruano Fonseca Araujo

    Conception the simulation and optimization technologies for industrial processes applied in the mining environment: tools and methodologies. Clarifications provided about the differences of these tech

    Oct 3, 2019

  • DFI
    Capacity Prediction Vs. Performance Of Driven Pre-Cast Pre-Stressed Concrete Piles In Chesapeake, Virginia

    By Emad Farouz

    This paper compares the predicted axial capacity of driven Pre-cast Pre-stressed Concrete (PPC) piles for the Lake Gaston Water Treatment Plant (LGWTP) using several design methodologies versus the ax

    Jan 1, 2007

  • IIMP
    Capas y Capaces

    By Nahiri Hirsh

    El programa de fortalecimiento de capacidades Capas y Capaces impulsa el trabajo articulado de las instituciones educativas Nuestra Señora de La Merced, Rafael Loayza Guevara y Dos de Mayo, organizaci

    Sep 20, 2019

  • CIM
    Cape Breton Development Corporation - Victoria Junction coal preparation plant

    By J. G. Martin, J. C. Campbell

    THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of

    Jan 1, 1985

  • CIM
    Cape Breton Development Corporation's experience with a tunnel-boring machine in coal measures

    By Dan Currie, Tom Lamb, J. Coady Marsh, Gary Landry

    "This paper describes the Cape Breton Development Corporation's experience with the Lovat M-300 tunnel-boring machine at the Donkin-Morien Mine. Between January 3 and December 21, 1984, the 7.6 m

    Jan 1, 1986

  • CIM
    Cape Breton Development Corporation: An overview

    By J. Kochhar, Robert G. Cooper

    "The Cape Breton Development Corporation is a federal Crown corporation which was formed in 1968. Initially, the Corporation had two divisions - the Industrial Development Division, whose purpose was

    Jan 1, 1990

  • AUSIMM
    Cape Lambert Port B Shiploading, Sampling and Analysis

    By M Graham, R Brunning, C Andringa-Bate, S Westergren

    In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por

    Jul 29, 2014

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • DFI
    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • AIME
    Capillarity – Permeability - Capillary Desaturation in Unconsolidated Beads

    By John C. Calhoun, Frank T. Bethel

    The application of a method for analyzing pressure build-up curves to determine the effective permeability in the Spraberry is presented. Sixteen upper Spraberry wells of the Driver area arc analyzed

    Jan 1, 1953

  • SME
    Capillary Cover Design For Leach Pad Closure

    By K. Burke, G. Zhan, A. Mayer

    A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil

    Jan 1, 2001

  • AIME
    Capital and Labor

    By Leo Wolrnan

    IN the relations that exist between capital and labor in this country, there is a bright as well as a dark side. After many years of distressing conditions of labor and a plentiful supply of propagand

    Jan 1, 1938

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990