Search Documents

  • SME
    Building An Intelligent Mining System – Morenci’s Approach

    By J. A. Flinn

    Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y

    Jan 1, 2000

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • SME
    Building and executing an effective risk system for the mining industry

    By Ewan Alexander

    "As human beings, we have managed risk since the dawn of the ages and have been adept at doing so. In order to survive, we hunted or gathered. If we did not take enough risk, we died. If we took much

    Oct 1, 2016

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Building AsiaÆs Latest Hard Rock Mine

    By T J. V Duffy, L H. D Siahaan, P G. Albert

    G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard

    Nov 20, 2012

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • CIM
    Building Better Products Faster: The Case of Devinci's Instrumented Bike

    By P. Maltais

    Over the last 10 years, Computer Aided Design, Finite Elements Analysis and field testing of prototypes have enabled the cycling industry to grow and to significantly improve its products. However, to

    Jan 1, 2006

  • AIME
    Building Blocks Of Industry - Industrial Minerals In 1968 - Asbestos

    By Paul A. Filteau

    Asbestos ranks among the leading minerals produced in Canada. It is also mined in Russia, Rhodesia, South Africa, Cyprus, Italy, the U.S.A., Japan, China and several other countries. The most abundant

    Jan 1, 1969

  • SME
    Building Confidence In Assays (d8c1597e-80a0-48c3-a2e6-7c4852121ba6)

    By L. Bloom

    In 1996, lack of confidence in assaying methods and sample handling affected companies as diverse as Bre-X and Timbuktu. Both share prices and the ability to raise financing are impacted when the qual

    Jan 1, 1997

  • CIM
    Building from the ground up in the Sahara The complexities of project execution in a developing country

    By Olivia Gamache

    When working in remote and extreme environments, projects are faced with new challenges for engineering and project execution. This is heightened when also working in countries with a developing env

    May 1, 2013

  • SME
    Building High Performance Teams And Enhancing Cash Flow

    By W. M. Hart

    Business Process Improvement (“BPI”) Change to Survive “It is not the strongest of species that survive, nor the most intelligent, but the one most responsive to change.” [Charles Darwin]

    Jan 1, 2006

  • SME
    Building Human Resources Through Systematically Designed Instruction

    By R. E. Mclvor

    This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding

    Jan 1, 2008

  • CIM
    Building International Expertise

    By Jane Spooner

    "The papers presented in this edition of the Bulletin cover some of the business issues that face mining companies exploring or operating in jurisdictions outside Canada. While technical innovations m

    Jan 1, 2004

  • CIM
    Building Nunavut?s First Diamond Mine: The Jericho Diamond Mine Canada?s Third and Nunavut's First Diamond Mine

    Project Details ? Located 420 km northeast of Yellowknife, Northwest Territories ? Jericho kimberlite discovered in 1995 ? Feasibility study showed +3,000,000 carats recovered from 2.6 million to

    May 1, 2006

  • CIM
    Building on Canadian Capabilities for Space Resource Missions

    By John Ratti

    Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes

    May 1, 2013

  • SME
    Building On Success: SME Minnesota Section Annual Meeting

    For the past two years, Cliffs Natural Resources in Minnesota has tried an experiment: it has staffed a booth at the Iron Range Earth Fest. ?It was a little unusual for a mining company to participate

    Jan 1, 2012

  • AUSIMM
    Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, Australia

    The relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the

    Jan 1, 2009

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • DFI
    Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And Challenges

    By Manchanda H, Agarwal J.

    The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen

    Sep 1, 2022