Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite ElementsBy Aarao de Andrade Lima
Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski
Jan 1, 1997
-
Resin-Grouted Cables For Longwall Tailgate Support StabilityBy Stephen C. Tadolini
The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en
Jan 1, 1994
-
Understanding the Connection between Blasting and Highwall StabilityBy R. Quentin Eades, Kyle Perry
"Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i
Jan 1, 2018
-
The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height PanelBy Dezhong Kong, Jaichen Wang, Shengli Yang
"The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t
Jan 1, 2015
-
Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture ProcessBy Liu Changyou
This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce
Jan 1, 2003
-
Study on Environmental Management of Mining Subsidence AreasBy Weijia Guo
With the exploitation of coal resources, a large area of land had been affected by surface subsidence, causing conflicts between man and land to become more conspicuous by the day, affecting the life
Jan 1, 2006
-
Study on the Modified Model of Probability Integra MethodBy Zhang Hongzhen
The fast convergence of boundary is a major problem of probability integral method, especially for the prediction of mining under thick alluvium, abandoned mine goaf, etc. To solve this problem and im
Jan 1, 2014
-
Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)By Vincent Scovazzo
Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u
Jan 1, 2002
-
Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead LineBy Axel Preusse
A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate
Jan 1, 2003
-
The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone MinesBy Simon H. Prassetyo
Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre
Jan 1, 2011
-
A Rock Mass Strength Concept For Coal SeamsBy George S. Kalamaras
Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down
Jan 1, 1993
-
Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)By Thomas Barczak
Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application
Jan 1, 2005
-
Fully Grouted Torque Tension Bolts Successfully Support Pittsburgh Seam Longwall Gate-roadsBy John Kucish
Roof bolting in the Pittsburgh Coalbed takes many forms today: coupled partially grouted bolts, fully grouted rebar, passive cable bolts, tensioned cable bolts, and torque tension rebar. The Federal N
Jan 1, 2005
-
Shear Bond Stresses Along Cable BoltsBy Hani S. Mitri
The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio
Jan 1, 1990
-
An Investigation Into The Effectiveness Of Support Systems Combining Steel Supports And Rock Bolts Within Coal Mine RoadwaysBy D. Reddish
The combination of free standing steel supports, such as arches, and rock bolts (mixed support) has Frequently been in used in UK coal mine roadways when it is considered that the strata and/or enviro
Jan 1, 2004
-
Stability of Backfilled Cross-panel Entries During Longwall MiningBy Brad Seymour
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Rockbolting For Highly Stressed RoadwaysBy Holger Witthaus
The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m
Jan 1, 2000
-
Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek MineBy Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Mine Panel Collapse - Two Case StudiesBy Hanjie Chen
A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar
Jan 1, 1999
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian ConditionsBy Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999