Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff Wall

    By Gene Bryant, Wesley Schmutzler, Matteo Bertoni

    The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00

    Jan 1, 2019

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in Bangladesh

    By Arpit Parikh

    "Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro

    Jan 1, 2017

  • DFI
    Interlocking H-Sections For Cofferdams Resist High Pressure

    By Marc Dondelinger

    Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca

    Jan 1, 1985

  • DFI
    DFI Collaborates on Risk-Based Panels

    By Derrick Dasenbrock

    Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co

    Sep 1, 2023

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011

  • DFI
  • DFI
    Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier Walls

    By R. Lee Wooten, David R. Shields, Darren D. Clark

    "Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con

    Jan 1, 2016

  • DFI
    Innovative Methods for Underground Parking in Central Cities

    By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu

    "Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni

    Jan 1, 2017

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005

  • DFI
    Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods

    By Ali Azizian, Brian Hall

    "Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir

    Jan 1, 2016

  • DFI
  • DFI
    Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? Summary

    By Larry Rayburn

    Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi

    Jan 1, 1991

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • DFI
    Wet Soil Mixing for Supporting Bridge Abutments on Spread Footings

    By Adam Gerondale, David Hemstreet, Lisheng Shao, Kenji Yamasaki

    "Foundation soils of a proposed single-span bridge over a busy railroad in Anchorage, Alaska included a layer of sensitive, non-plastic to low-plasticity silt. Slope stability analyses showed that, wi

    Jan 1, 2015

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years Later

    By Karl A. Higgins

    In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages