Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gas Evolution Trends for Coal from Two Different Areas at Clarence Colliery

    By J Sargeant, T Levi, J Theiler, B Beamish

    Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper

    Aug 31, 2015

  • AUSIMM
    Rotary Drilling Automation Increasing Operator Productivity and Drilling Quality

    By L Eriksson, D Penn, J Appelgren

    Atlas Copco, a leading supplier of equipment and services to the mining and construction industries, is consistently pursuing its strategy to offer the most productive and economical solutions by cont

    Sep 18, 2012

  • AUSIMM
    Indicator kriging saves the day – improving reconciliation

    By A Purton, C Taylor, E Conroy

    The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties

    Mar 22, 2022

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and Optimisation

    By O Arafat, K M. Bartholomew

    A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia

    Sep 1, 2014

  • AUSIMM
    Metso SmartTag - The Next Generation and Beyond

    By K J. Riihioja, E Nozawa

    SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f

    Sep 26, 2011

  • AUSIMM
    Iron Ore Final Grinding by High Pressure Grinding Rolls and Air Classification

    By F P. van der Meer, E Lessing, E Matthies

    High pressure grinding rolls (HPGR) technology is growing to be a common comminution tool in iron ore processing. The technology finds a wide acceptance and presents specific benefits in coarse ore gr

    Jul 13, 2015

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    The Implementation of FloatStar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits

    By D Phillpotts, S M. Mantsho, P Strobos

    A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical

    Oct 29, 2012

  • AUSIMM
    Wet Grinding of ?Vanadium-Titanium Magnetite Concentrate in a Ball Mill

    By R Zhang, J Xu, X Lv, C Bai, S Zhang

    This paper studies the grinding behaviour of vanadium-titanium magnetite concentrate in a ball mill. The grinding kinetics, surface morphology, lattice distortion, wettability and moisture capacity we

    Aug 12, 2013

  • AUSIMM
    Three Decades of Gold Production at the Newmont Tanami Operations

    By A Cranley, A Giblett, S Thacker

    The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil

    Sep 1, 2014

  • AUSIMM
    "A Geometallurgical Proxy for Nickel Laterite Heap Leaching"

    By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman

    "Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long

    Jun 15, 2016

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    Research on the throughput of inertia cone crusher using orthogonal experimental method

    By X Xia2, X Wang, G Liang, T Song, F Ma

    Inertia cone crushers have found applications mostly in steel slag crushing operations in China. Compared with conventional eccentric cone crushers, the crusher has an obvious advantage in reducing pr

    Aug 24, 2022

  • AUSIMM
    Near field blast vibration monitoring for slot or winze blast analysis

    By E Wargem

    The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is

    Mar 29, 2023

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021